Difference between revisions of "DEWBOT II Week Two Build Season Photo Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) |
MaiKangWei (talk | contribs) |
||
Line 1: | Line 1: | ||
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> | ||
− | File: | + | File:DB2_Sabatino_Kathleen_Cassie_lift_upright_060118_csm.jpg|Paul Sabatino, Kathleen & Cassie work on lift upright |
− | File: | + | File:DB2_Heather_filing_lift_upright_060118_csm.jpg|Heather filing lift upright |
− | File: | + | File:DB2_chassis_with_beater_bar_motor_060118_csm.jpg|Chassis with beater bar motor |
− | File: | + | File:DB2_chassis_with_beater_bar_060118_csm.jpg|Chassis with beater bar |
− | File: | + | File:DB2_Schwenk_Faller_ramp_060118_csm.jpg|Ernest Schwenk & Ed Faller finish the ramp |
− | File: | + | File:DB2_John_shooter_prototype_060118_csm.jpg|John assembling shooter prototype |
− | File: | + | File:DB2_Heather_060121_csm.jpg|Heather |
− | File: | + | File:DB2_Heather_drilling_060121_csm.jpg|Heather drilling |
− | File: | + | File:DB2_lift_upright_060121_csm.jpg|deburring lift upright |
− | File: | + | File:DB2_Cassie_Kevin_bandsaw_060121_csm.jpg|Cassie & Kevin |
− | + | </gallery> | |
− | <gallery | + | ---- |
[[Category:Robot]][[Category:DEWBOT II]] | [[Category:Robot]][[Category:DEWBOT II]] |
Revision as of 21:32, 22 August 2009
- DB2 Heather filing lift upright 060118 csm.jpg
Heather filing lift upright
- DB2 chassis with beater bar motor 060118 csm.jpg
Chassis with beater bar motor
- DB2 chassis with beater bar 060118 csm.jpg
Chassis with beater bar