Difference between revisions of "DEC Second Bay Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) |
MaiKangWei (talk | contribs) |
||
Line 1: | Line 1: | ||
− | 24-November-2009 move into second bay in the [[Downingtown Educational Center]] Shop. | + | Photos from the 24-November-2009 move into second bay in the [[Downingtown Educational Center]] Shop. |
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> |
Revision as of 01:16, 26 November 2009
Photos from the 24-November-2009 move into second bay in the Downingtown Educational Center Shop.
- Shelf asm MattK Cole Douglas 091124 csm.jpg
Matt K, Cole & Douglas assembling VRC shelves