==3-October== | ==3-October== | ||
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | Image:FTC7413_131003_csm.jpg|Eric, Brad & CJ adding arms to current configuration | ||
+ | Image:FTC7314_notebook_20131003_1.jpg|Arm modification | ||
+ | Image:FTC7314_notebook_20131003_2.jpg|Possible modification to scoring mechanism | ||
+ | </gallery> | ||
==5-October== | ==5-October== | ||
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | Image:FTC7314_notebook_20131005_1.jpg|Arranging robot components | ||
+ | Image:FTC7314_notebook_20131005_2.jpg|Arm modification to four bar | ||
+ | Image:FTC7314_notebook_20131005_3.jpg|Autonomous program | ||
+ | </gallery> | ||
==10-October== | ==10-October== | ||
Line 8: | Line 18: | ||
==12-October== | ==12-October== | ||
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> | ||
− | Image:FTC7413_131012_csm-1.jpg| | + | Image:FTC7413_131012_csm-1.jpg|Robot |
− | Image:FTC7413_131012_csm-2.jpg| | + | Image:FTC7413_131012_csm-2.jpg|Arm & flag drives |
− | Image:FTC7413_131012_csm-3.jpg| | + | Image:FTC7413_131012_csm-3.jpg|Arm bushings |
− | Image:FTC7413_131013_csm-1.jpg| | + | Image:FTC7413_131013_csm-1.jpg|Robot with Omni Wheels |
− | Image:FTC7413_131013_csm-2.jpg| | + | Image:FTC7413_131013_csm-2.jpg|Drive-train ''sans'' chains |
− | Image:FTC7413_131013_csm-3.jpg| | + | Image:FTC7413_131013_csm-3.jpg|Arm & flag drives |
− | Image:FTC7413_131013_csm-4.jpg| | + | Image:FTC7413_131013_csm-4.jpg|Arm & flag drives |
− | Image:FTC7413_131013_csm-5.jpg| | + | Image:FTC7413_131013_csm-5.jpg|Arm & flag drives |
Image:FTC7413_131013_csm-6.jpg|Arial view of flag raising - note misalignment | Image:FTC7413_131013_csm-6.jpg|Arial view of flag raising - note misalignment | ||
− | Image:FTC7413_131013_csm-7.jpg| | + | Image:FTC7413_131013_csm-7.jpg|Arial view of flag raising - note misalignment |
Image:nonamebotsm_131013.jpg|''SOLIDWORKS'' rendering | Image:nonamebotsm_131013.jpg|''SOLIDWORKS'' rendering | ||
Image:nonamerearquartersm_131013.jpg|''SOLIDWORKS'' rendering | Image:nonamerearquartersm_131013.jpg|''SOLIDWORKS'' rendering | ||
+ | Image:FTC7314_notebook_20131012_1.jpg|Robot configuration | ||
+ | </gallery> | ||
+ | |||
+ | ==17-October== | ||
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | Image:FTC7314_notebook_20131017_1.jpg|Testing the shovel | ||
+ | image:FTC7314_131017.jpg|SolidWorks rendering | ||
+ | image:FTC7314_131017_csm-2.jpg|building arm | ||
+ | image:FTC7314_131017_csm-3.jpg|testing arm | ||
+ | </gallery> | ||
+ | |||
+ | Worked on the shovel and prepared for Duel on the Delaware. | ||
+ | |||
+ | ==19-October - [[DEWBOT IX Duel on the Delaware | Duel on the Delaware]]== | ||
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | Image:DB9_DD_131019_csm-6.jpg|Andrew Weissman works with Trevor | ||
+ | Image:DB9_DD_131019_csm-10.jpg|Dragos | ||
+ | Image:DB9_DD_131019_csm-14.jpg|Nicholas | ||
+ | Image:DB9_DD_131019_csm-15.jpg|CJ & Nicholas | ||
+ | Image:DB9_DD_131019_csm-16.jpg|Testing the robot | ||
+ | Image:DB9_DD_131019_csm-17.jpg|Eric & CJ | ||
+ | Image:DB9_DD_131019_csm-18.jpg|CJ & Andrew Weissman hold the robot as Nicholas and Julie Christopher test | ||
+ | Image:DB9_DD_131019_csm-19.jpg|First ever competition match for 7314! Nicholas, Andrew Weissman & CJ | ||
+ | Image:DB9_DD_131019_csm-20.jpg|Defense against teleop block scoring is easy in this game | ||
+ | Image:DB9_DD_131019_csm-21.jpg|Brad, Andrew Weissman & Eric | ||
+ | Image:DB9_DD_131019_csm-22.jpg|CJ | ||
+ | Image:FTC7314_notebook_20131019_1.jpg|Connection of intake to arm | ||
+ | </gallery> | ||
+ | |||
+ | ==24-October== | ||
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | Image:7314BPDeployed.jpg|Flag crank deployed | ||
+ | Image:7314BPRestrained.jpg|Flag crank restrained within chassis perimeter for game start | ||
+ | Image:7314BPBirdseyegreen.jpg|Plan view (w/out perspective) showing flag crank in both states | ||
+ | </gallery> | ||
+ | |||
+ | ==26-October== | ||
+ | A productive day. We: | ||
+ | * Cut, bent and otherwise fabricated and installed the robot's electronics panels... | ||
+ | * ...and rationally installed many of the key electronic components (NXT & Motor Controllers) | ||
+ | * Replaced the 4:1 worm gear with 20:1 | ||
+ | * Started mounting IR Seeker sensors | ||
+ | * Built the lower part of the flag pole | ||
+ | * Installed the flag lift | ||
+ | * Scoped out where the limit switches ought to be mounted | ||
+ | * Worked on autonomous coding | ||
+ | |||
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | Image:FTC7413_131026_csm-1.jpg|Drew, Heather McKown & CJ | ||
+ | Image:FTC7413_131026_csm-2.jpg|Drew | ||
+ | Image:FTC7413_131026_csm-3.jpg|CJ | ||
+ | Image:FTC7413_131026_csm-4.jpg|Trevor, [[User:gdeaver | Gary Deaver]], Drew, [[User:Jcbc | Julie Christopher]] | ||
+ | Image:FTC7413_131026_csm-5.jpg|Electronics panel | ||
+ | Image:FTC7413_131026_csm-6.jpg|Robot | ||
+ | Image:FTC7314_notebook_20131026_1.jpg|Electronics panel, flag device, IR sensors | ||
+ | Image:FTC7314_notebook_20131026_2.jpg|Flag crank configuration | ||
</gallery> | </gallery> | ||
+ | |||
+ | ==31-October== | ||
+ | A short crew for this meeting (CJ & Clem). In spite of this, we got a lot of work completed: | ||
+ | * Finished and tested the Flag Lift. Finishing included cutting the crank arms shorter and installing hard, slippery PTFE-impregnated Acetal (polyoxymethylene) contact plates on the teterix beam surfaces restraining the crack blades. | ||
+ | * The arm motor was changed (old one dead) and tested. | ||
+ | * The power switch and battery were logically (but perhaps not optimally) mounted. | ||
+ | * The NXT was shifted to move it away from the frame perimeter for safety. | ||
+ | * The battery, switch and motor controllers were wired. Wired were dressed using wire ties. | ||
+ | |||
---- | ---- | ||
− | [[Category:FTC]][[Category:Block Party!]] | + | [[Category:FTC]][[Category:Block Party!]][[Category:Photo Galleries]] |
Latest revision as of 21:23, 1 December 2013
Contents
3-October
5-October
10-October
12-October
17-October
Worked on the shovel and prepared for Duel on the Delaware.
19-October - Duel on the Delaware
24-October
26-October
A productive day. We:
- Cut, bent and otherwise fabricated and installed the robot's electronics panels...
- ...and rationally installed many of the key electronic components (NXT & Motor Controllers)
- Replaced the 4:1 worm gear with 20:1
- Started mounting IR Seeker sensors
- Built the lower part of the flag pole
- Installed the flag lift
- Scoped out where the limit switches ought to be mounted
- Worked on autonomous coding
Trevor, Gary Deaver, Drew, Julie Christopher
31-October
A short crew for this meeting (CJ & Clem). In spite of this, we got a lot of work completed:
- Finished and tested the Flag Lift. Finishing included cutting the crank arms shorter and installing hard, slippery PTFE-impregnated Acetal (polyoxymethylene) contact plates on the teterix beam surfaces restraining the crack blades.
- The arm motor was changed (old one dead) and tested.
- The power switch and battery were logically (but perhaps not optimally) mounted.
- The NXT was shifted to move it away from the frame perimeter for safety.
- The battery, switch and motor controllers were wired. Wired were dressed using wire ties.