Difference between revisions of "FTC 7314 Engineering Notebook 2015-11-07"
From DEW Robotics
MaiKangWei (talk | contribs) (→Competition Season Meeting) |
TheBadJosh (talk | contribs) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 5: | Line 5: | ||
!Meeting Date !!Meeting Time !!Location !!Attendees | !Meeting Date !!Meeting Time !!Location !!Attendees | ||
|- | |- | ||
− | | | + | | 7-November-2015 |
− | | | + | | 12:00-5:00PM |
| TCHS Brandywine | | TCHS Brandywine | ||
− | | | + | | Josh, Braden, Bennett, Wade, Trent, Justin, Amal |
|} | |} | ||
Line 33: | Line 33: | ||
!Tasks !! Reflections | !Tasks !! Reflections | ||
|- | |- | ||
− | | ''' | + | | '''Bending Front Guards''' |
| | | | ||
− | * Josh | + | * Josh bent lots of plastic. He bent the plastic over a steel tube in order to make it curved. He had to heat up the plastic in several places. He finished with this and plans to mount it to the robot next meeting. |
|- | |- | ||
− | | ''' | + | | '''Finishing and Improving Drive Train''' |
| | | | ||
− | * | + | * Some people came in before hand and worked a lot on the robot. They now have the lifter done. We watched video's of other teams robots and took an idea, we have 2 gear shaped wheels to push on the pole's. We have probably had the most productive day so far today. |
* Josh worked to mill a shaft key for a new shaft to place in the gear box of the arm. | * Josh worked to mill a shaft key for a new shaft to place in the gear box of the arm. | ||
*Bennett helped Wade replace the old bolts. He also drilled holes in the tetrix mount for the gearbox. | *Bennett helped Wade replace the old bolts. He also drilled holes in the tetrix mount for the gearbox. | ||
Line 45: | Line 45: | ||
*Amal was controlling the phone throughout the attempts of driving the robot up the mountain. | *Amal was controlling the phone throughout the attempts of driving the robot up the mountain. | ||
|- | |- | ||
− | | '''Braden and | + | | '''electrical work''' |
+ | | | ||
+ | *Braden and Trevor tried to find the best place to put the electronics. Then they worked on putting on all of the Velcro on the electronic controllers. | ||
|- | |- | ||
− | |||
|} <!-- End of tasks table; DO NOT REMOVE --> | |} <!-- End of tasks table; DO NOT REMOVE --> |
Latest revision as of 06:11, 4 December 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
7-November-2015 | 12:00-5:00PM | TCHS Brandywine | Josh, Braden, Bennett, Wade, Trent, Justin, Amal |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Objective in bold |
|
Objective in bold |
|
Tasks | Reflections |
---|---|
Bending Front Guards |
|
Finishing and Improving Drive Train |
|
electrical work |
|
Action and idea Journal
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|