Difference between revisions of "FTC 7314 Engineering Notebook 2014-09-20"
From DEW Robotics
MaiKangWei (talk | contribs) (→Competition Season Meeting) |
MaiKangWei (talk | contribs) (→Competition Season Meeting) |
||
Line 21: | Line 21: | ||
*Akhila learned how to use certain aspects of the Lab View programming language, and saw how the program generally worked. She ran a program that measured the signal strengths in different indexes, and put the IR sensor on different paths to collect the signal strengths. The initial task is to go straight, and turn when the strength is greater than the threshold on sensor three, or the "slightly to the right" sensor. | *Akhila learned how to use certain aspects of the Lab View programming language, and saw how the program generally worked. She ran a program that measured the signal strengths in different indexes, and put the IR sensor on different paths to collect the signal strengths. The initial task is to go straight, and turn when the strength is greater than the threshold on sensor three, or the "slightly to the right" sensor. | ||
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> | ||
− | image: | + | image:FTC7314_140920_csm-1.jpg| |
− | + | image:FTC7314_140920_csm-2.jpg| | |
− | image: | + | image:FTC7314_140920_csm-10.jpg| |
− | image: | ||
</gallery> | </gallery> | ||
|- | |- |
Revision as of 03:42, 22 September 2014
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
Saturday, September 20, 2014 | 2pm-5pm | TCHS Brandywine | Akhila, Eric, Nick, Brad, CJ, Laura, Amal, Braden, Justin, Josh, Morgan, Trevor |
Tasks | Reflections |
---|---|
Collect Data About IR Signal Strengths |
|
Finishing Creating The Test Chassis |
|
Creating The scouting Sheets |
|
Continue Proto-typing the Shooter |
|
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|