Difference between revisions of "FTC 7314 Engineering Notebook 2014-09-20"
From DEW Robotics
MaiKangWei (talk | contribs) (→Competition Season Meeting) |
MaiKangWei (talk | contribs) (→Competition Season Meeting) |
||
Line 43: | Line 43: | ||
*Then we tested a motor with a modified gear box. It spun really slow and doesn't have enough power. | *Then we tested a motor with a modified gear box. It spun really slow and doesn't have enough power. | ||
*For next meeting, we are going to test the motor without the gear box, but geared down a little. We are hoping a 2-1 gear ratio will work. | *For next meeting, we are going to test the motor without the gear box, but geared down a little. We are hoping a 2-1 gear ratio will work. | ||
− | * next week the shooter will be modified and attached to the | + | * next week the shooter will be modified and attached to the chassis in the next meeting. |
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | image:FTC7314_140920_csm-6.jpg| | ||
+ | image:FTC7314_140920_csm-7.jpg| | ||
+ | image:FTC7314_140920_csm-8.jpg| | ||
+ | image:FTC7314_140920_csm-9.jpg| | ||
+ | image:FTC7314_140920_csm-10.jpg| | ||
+ | image:FTC7314_140920_csm-12.jpg| | ||
+ | </gallery> | ||
|} | |} | ||
Revision as of 04:46, 22 September 2014
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
Saturday, September 20, 2014 | 2pm-5pm | TCHS Brandywine | Akhila, Eric, Nick, Brad, CJ, Laura, Amal, Braden, Justin, Josh, Morgan, Trevor |
Tasks | Reflections |
---|---|
Collect Data About IR Signal Strengths |
|
Finishing Creating The Test Chassis |
|
Creating The scouting Sheets |
|
Continue Proto-typing the Shooter |
|
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|