Difference between revisions of "FTC 7314 Engineering Notebook 2016-04-18"
From DEW Robotics
Akhila2014 (talk | contribs) (Created page with '=='''Competition Season Meeting'''== <!-- This is the meeting information table --> {|border=1 cellpadding="10" !Meeting Date !!Meeting Time !!Location !!Team Members in Attenda...') |
Akhila2014 (talk | contribs) |
||
Line 26: | Line 26: | ||
| | | | ||
*Assessed backup materials that need to be ordered prior to World’s: | *Assessed backup materials that need to be ordered prior to World’s: | ||
− | 2 AndyMark NeverRest 40’s | + | -2 AndyMark NeverRest 40’s |
− | 1 Carbon Fiber Rod (in case the spring arm snaps) | + | -1 Carbon Fiber Rod (in case the spring arm snaps) |
− | 1 Tetrix V2 for arm (we used our spare when the motor smoked on Saturday) | + | -1 Tetrix V2 for arm (we used our spare when the motor smoked on Saturday) |
− | 1 motor (check model) for winch | + | -1 motor (check model) for winch |
− | Velcro - (consumer-grade) | + | -Velcro - (consumer-grade) |
− | Duct tape | + | -Duct tape |
*Outlined remaining tasks to be completed: | *Outlined remaining tasks to be completed: | ||
− | Modify ramp length based on debris tube location and remove screw. Replace screw with adhesive | + | -Modify ramp length based on debris tube location and remove screw. Replace screw with adhesive |
− | Swap old AndyMark NeverRest 40s for newer ones in drivetrain | + | -Swap old AndyMark NeverRest 40s for newer ones in drivetrain |
− | Secure the new USB connections | + | -Secure the new USB connections |
After swapping motors, wire up the chain on climbing arm to prevent slippage | After swapping motors, wire up the chain on climbing arm to prevent slippage | ||
− | Test and Debug Blue Autonomous | + | -Test and Debug Blue Autonomous |
− | Lighten the robot if possible | + | -Lighten the robot if possible |
− | Get absentee letter for school | + | -Get absentee letter for school |
− | Buttons? Hats? Shirts? Pit? | + | -Buttons? Hats? Shirts? Pit? |
|- | |- | ||
|- | |- |
Revision as of 01:24, 25 April 2016
Competition Season Meeting
Meeting Date | Meeting Time | Location | Team Members in Attendance: |
---|---|---|---|
18 April 2016 | 6pm-9pm | TCHS Brandywine | Akhila, Josh, Trevor, Amal, Braden, Bennett, Daniel |
Tasks | Reflections |
---|---|
Team Meeting |
|
Figuring Out Backup Materials/Priorities |
-2 AndyMark NeverRest 40’s -1 Carbon Fiber Rod (in case the spring arm snaps) -1 Tetrix V2 for arm (we used our spare when the motor smoked on Saturday) -1 motor (check model) for winch -Velcro - (consumer-grade) -Duct tape
-Modify ramp length based on debris tube location and remove screw. Replace screw with adhesive -Swap old AndyMark NeverRest 40s for newer ones in drivetrain -Secure the new USB connections After swapping motors, wire up the chain on climbing arm to prevent slippage -Test and Debug Blue Autonomous -Lighten the robot if possible -Get absentee letter for school -Buttons? Hats? Shirts? Pit? |