Difference between revisions of "DEWBOT XVI Final Daze Build Season Photo Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) (→Sunday February 23, 2020) |
MaiKangWei (talk | contribs) (→Sunday February 23, 2020) |
||
Line 6: | Line 6: | ||
image:DB16_Build_20200223-4.jpg| | image:DB16_Build_20200223-4.jpg| | ||
image:DB16_Build_20200223-5.jpg|Bottom of Climber Extension - Bronze Leadscrew Nut (turned down) inside a 1" OD x 0.028" wall steel tube inside a printed square linear bearing, all held together with four 6-32 x 7/16" SHCSs which thread into the Leadscrew Nut. This all travels within a 1-1/2" x 1/16" wall 6061 Al square tube. | image:DB16_Build_20200223-5.jpg|Bottom of Climber Extension - Bronze Leadscrew Nut (turned down) inside a 1" OD x 0.028" wall steel tube inside a printed square linear bearing, all held together with four 6-32 x 7/16" SHCSs which thread into the Leadscrew Nut. This all travels within a 1-1/2" x 1/16" wall 6061 Al square tube. | ||
− | image:DB16_Build_20200223-6.jpg|Aerin adds limit switches to Prime's Climber. | + | image:DB16_Build_20200223-6.jpg|Aerin adds limit switches to Prime's Climber. We have an encoder on the Climber gearbox (after the shifter), but the potential for the leadscrews to damage the Climber mechanism led us to add this safeguard. |
image:DB16_Build_20200223-7.jpg| | image:DB16_Build_20200223-7.jpg| | ||
image:DB16_Build_20200223-8.jpg| | image:DB16_Build_20200223-8.jpg| |