Difference between revisions of "FTC 7314 build October 2013"
From DEW Robotics
MaiKangWei (talk | contribs) (→26-October) |
MaiKangWei (talk | contribs) (→26-October) |
||
Line 53: | Line 53: | ||
* Replaced the 4:1 worm gear with 20:1 | * Replaced the 4:1 worm gear with 20:1 | ||
* Started mounting IR Seeker sensors | * Started mounting IR Seeker sensors | ||
+ | * Built the lower part of the flag pole | ||
+ | * Installed the flag lift | ||
* Scoped out where the limit switches ought to be mounted | * Scoped out where the limit switches ought to be mounted | ||
* Worked on autonomous coding | * Worked on autonomous coding |
Revision as of 23:44, 26 October 2013
Contents
3-October
5-October
10-October
12-October
17-October
19-October - Duel on the Delaware
24-October
26-October
A productive day. We:
- Cut, bent and otherwise fabricated and installed the robot's electronics panels...
- ...and rationally installed many of the key electronic components (NXT & Motor Controllers)
- Replaced the 4:1 worm gear with 20:1
- Started mounting IR Seeker sensors
- Built the lower part of the flag pole
- Installed the flag lift
- Scoped out where the limit switches ought to be mounted
- Worked on autonomous coding
Trevor, Gary Deaver, Drew, Julie Christopher