Mike Rizzo, Siri Maley, Jon Davis & Clem McKown building Spindle
Dave Wilson installing and wiring elecronics
Foster Schucker & Dave Wilson installing electrical/electronics
Jon Davis, Mike Rizzo, Alex Clark & Foster Schucker
Dave Wilson wiring
Right-side pneumatic storage assembly
Left-side pneumatic storage assembly
Siri Maley building pneumatic storage assemblies
Clem McKown (workign or hiding) behind chassis
Foster Schucker proud in Team 1511 colors & Julie Bachmann
Matthew Rusnak installing pneumatic components
Julie Bachmann & Alex Clark install pneumatic storage
Foster Schucker holding traverse drive unit (now with Plaction wheel)
Matt Klufas puts finishing touches on hopper
Spindle
Julie Bachmann, Matt Klufas & Matthew Rusnak
Julie Bachmann & Matt Klufas (with calipers)
Siri Maley & Heather McKown install the hopper for the first time on the robot (It'll come off soon)
Siri Maley & Elizabeth Murphy prepare to drill front-right chassis panel holes
Elizabeth Murphy prepares to drill front-right chassis panel holes
Right-rear chassis showing traverse drive & pneumatic storage