The state of the robot - start of week
Don Mullings & Matt K drilling holes for solenoid mounts
Heather holding up lift for Siri
Matt K & Don Mullings working on solenoid mounts
Heather
Matt K tapping 4-40 solenoid mount holes
Mike fabricating Catapult shock absorbers
Siri working under the robot
Mark Posner working on robot with Zak, Siri & Mike
Heather cutting SFO bolts
Matt K mounting solenoid
Zak cutting bolts
Faith McKown, Siri & Annette Posner drilling set-screw holes in winch spool
Dan, Mike & Mike Coll
no idle hands here... (Heather, Matt K, Siri & Mike Coll)
...but some weary ones (Heather)
Matt K & Carly
Heather & Jack
Winch mounted and cable runs started
Drive wheel bearing blocks
Matt K & Siri install battery mount
Siri, Matt K, Clem McKown (under robot) & Paul
Mike & Paul
Heather with π/4 drilling jig (it's a math joke)
pneumatics assembly
Clem McKown running the lift cable
Clem McKown (under robot) running the lift up manually (for an audience)
Lift at full extension
Winch with (partial) cable