Difference between revisions of "DEC Second Bay Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) |
Saffranhill (talk | contribs) |
||
Line 4: | Line 4: | ||
Image:Shelf_asm_Carly_Selina_Jack_091124_csm.jpg|Carly, Selina & Jack starting to assemble VRC shelves | Image:Shelf_asm_Carly_Selina_Jack_091124_csm.jpg|Carly, Selina & Jack starting to assemble VRC shelves | ||
Image:Shelf_asm_Siri_Carly_Selina_091124_csm.jpg|Siri, Carly & Selina adding another shelf | Image:Shelf_asm_Siri_Carly_Selina_091124_csm.jpg|Siri, Carly & Selina adding another shelf | ||
− | + | ||
Image:Alex_drilling_091124_csm.jpg|Alex drilling pivot hole for new bay gate | Image:Alex_drilling_091124_csm.jpg|Alex drilling pivot hole for new bay gate | ||
Image:Deaver_Alex_installing_gate_091124_csm.jpg|Gary Deaver & Alex installing the new gate | Image:Deaver_Alex_installing_gate_091124_csm.jpg|Gary Deaver & Alex installing the new gate |
Revision as of 02:25, 26 November 2009
Photos from the 24-November-2009 move into second bay in the Downingtown Educational Center Shop.