Difference between revisions of "DEWBOT VI Build"

From DEW Robotics
Jump to: navigation, search
(Created page with 'This page contains a week by week breakdown of what we did. ===Kickoff=== ===Week One - Research and Brainstorm (1/3-1/10)=== ===Week Two - Prototype and Chassis Fabrication...')
 
Line 3: Line 3:
 
===Kickoff===
 
===Kickoff===
  
===Week One - Research and Brainstorm (1/3-1/10)===
+
===Week One (1/10-1/16)===
  
===Week Two - Prototype and Chassis Fabrication (1/11-1/17)===
+
===Week Two (1/17-1/23)===
  
===Week Three - Chassis Fabrication and Hopper Prototyping (1/18-1/24)===
+
===Week Three (1/24-1/30)===
  
===Week Four - Hopper Fabrication (1/25-1/31)===
+
===Week Four (1/31-2/6)===
  
===Week Five (2/1-2/7)===
+
===Week Five (2/7-2/13)===
  
===Week Six (2/8-2/14)===
+
===Week Six (2/14-2/20)===
  
===Final Few Build Daze (2/15-2/17)===
+
===Final Few Build Daze (2/21-2/23)===
  
 
----
 
----
 
[[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]]
 
[[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]]

Revision as of 02:06, 21 November 2009

This page contains a week by week breakdown of what we did.

Kickoff

Week One (1/10-1/16)

Week Two (1/17-1/23)

Week Three (1/24-1/30)

Week Four (1/31-2/6)

Week Five (2/7-2/13)

Week Six (2/14-2/20)

Final Few Build Daze (2/21-2/23)