Difference between revisions of "DEWBOT VI Week Five Build Season Photo Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) (→Friday February 12, 2010) |
MaiKangWei (talk | contribs) (→Saturday February 13, 2010) |
||
Line 107: | Line 107: | ||
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> | ||
+ | image:DB6_bumper_weigh-in_100213_csm_1.jpg|Bumper weigh-in | ||
+ | image:DB6_bumper_weigh-in_100213_csm_2.jpg|we're light! | ||
+ | image:DB6_Cole_Siri_Jen_kicker_100213_csm.jpg|Cole, Siri & Jen installing the kicker on the ''proxy chassis'' | ||
+ | image:DB6_camera_mount_100213_csm.jpg|Camera mount (prototype) | ||
+ | image:DB6_McKown_Andrew_Sasha_Moyer_CADers_100213_csm.jpg|CAD team - Clem McKown, Andrew, Sasha & David Moyer | ||
+ | image:DB6_Carly_Jen_100213_csm.jpg|Carly & Jen cutting 80/20 for the Operator Interface | ||
+ | image:DB6_Matt_Douglas_100213_csm.jpg|Matt & Douglas cut parts for the screwdriver | ||
+ | image:DB6_Melanie_Bachmann_100213_csm.jpg|Melanie & Julie Bachmann | ||
+ | image:DB6_Deaver_100213_csm.jpg|Gary Deaver running the ''possessor'' motor | ||
+ | image:DB6_Douglas_100213_csm.jpg|Douglas | ||
+ | image:DB6_Weissman_Deaver_McKown_100213_csm.jpg|John Weissman, Gary Deaver & Clem McKown | ||
+ | image:DB6_Rizzo_screwdriver_form_100213_csm.jpg|Mike Rizzo assembling the screwdriver skeleton | ||
+ | image:DB6_main_disconnect_mnt_100213_csm.jpg|Main disconnect mount (PMMA block) | ||
+ | image:DB6_Featherman_pneumatic_testbed_100213_csm.jpg|Scott Featherman wiring the pneumatic testbed | ||
+ | image:DB6_Siri_Deaver_Morun_kicker_100213_csm.jpg|Siri, Gary Deaver & Mark Morun test firing the kicker | ||
+ | image:DB6_Featherman_100213_csm.jpg|Scott Featherman with DEWBOT VI | ||
+ | image:DB6_Carly_calibrator_100213_csm.jpg|Carly holding the wheel calibration guide against the pivots | ||
+ | image:DB6_BenR_potentiometer_100213_csm.jpg|Ben R calibrating wheels with the potentiometers | ||
+ | image:DB6_Deaver_Morun_possessor_100213_csm.jpg|Gary Deaver & Mark Morun mounting the ''possessor'' | ||
+ | image:DB6_bainbots_apart_100213_csm.jpg|Bainbots P60 gearbox apart for a stage reduction | ||
+ | image:DB6_bainbots_togetherish_100213_csm.jpg|Bainbots 3-stage gearbox coming together | ||
+ | image:DB6_Douglas_Moyer_100213_csm.jpg|Douglas & David Moyer cutting steel for the kicker release | ||
+ | image:DB6_bump_1_01_100213_csm.jpg|Bump sequence 1/11 | ||
+ | image:DB6_bump_1_02_100213_csm.jpg|Bump sequence 2/11 | ||
+ | image:DB6_bump_1_03_100213_csm.jpg|Bump sequence 3/11 | ||
+ | image:DB6_bump_1_04_100213_csm.jpg|Bump sequence 4/11 | ||
+ | image:DB6_bump_1_05_100213_csm.jpg|Bump sequence 5/11 | ||
+ | image:DB6_bump_1_06_100213_csm.jpg|Bump sequence 6/11 | ||
+ | image:DB6_bump_1_07_100213_csm.jpg|Bump sequence 7/11 | ||
+ | image:DB6_bump_1_08_100213_csm.jpg|Bump sequence 8/11 | ||
+ | image:DB6_bump_1_09_100213_csm.jpg|Bump sequence 9/11 | ||
+ | image:DB6_bump_1_10_100213_csm.jpg|Bump sequence 10/11 | ||
+ | image:DB6_bump_1_11_100213_csm.jpg|Bump sequence 11/11 | ||
</gallery> | </gallery> | ||
---- | ---- | ||
[[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]] | [[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]] |
Revision as of 15:29, 14 February 2010
Contents
Sunday February 7, 2010
Monday February 8, 2010
Tuesday February 9, 2010
Wednesday February 10, 2010
Thursday February 11, 2010
Friday February 12, 2010
Matt & Michael mining 80/20 parts from DEWBOT IV
Saturday February 13, 2010
- DB6 BenR potentiometer 100213 csm.jpg
Ben R calibrating wheels with the potentiometers