Difference between revisions of "DEWBOT VI Week Four Build Season Photo Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) (→Wednesday February 3, 2010) |
MaiKangWei (talk | contribs) (→Wednesday February 3, 2010) |
||
(10 intermediate revisions by 6 users not shown) | |||
Line 5: | Line 5: | ||
Image:DB6_welded_frame_weight_100131_csm.jpg|welded frame mass | Image:DB6_welded_frame_weight_100131_csm.jpg|welded frame mass | ||
Image:DB6_bumper_weight_100132_csm.jpg|Mass of (blue) bumper set | Image:DB6_bumper_weight_100132_csm.jpg|Mass of (blue) bumper set | ||
− | Image:DB6_Siri_cutting_flange_100131_csm.jpg|Siri cutting flange for kicker elastic anchor | + | Image:DB6_Siri_cutting_flange_100131_csm.jpg|Siri Maley cutting flange for kicker elastic anchor |
Image:DB6_Christine_cutting_cRIO_panel_100131_csm.jpg|Christine cutting the cRIO panel | Image:DB6_Christine_cutting_cRIO_panel_100131_csm.jpg|Christine cutting the cRIO panel | ||
Image:DB6_Christine_cutting_Jaguar_panel_100131_csm.jpg|Christine cutting a Jaguar panel | Image:DB6_Christine_cutting_Jaguar_panel_100131_csm.jpg|Christine cutting a Jaguar panel | ||
Line 15: | Line 15: | ||
Image:DB6_Christine_sanding_Jaguar_panel_100131_csm.jpg|Christine sanding the Jaguar panel | Image:DB6_Christine_sanding_Jaguar_panel_100131_csm.jpg|Christine sanding the Jaguar panel | ||
Image:DB6 Jen assembling pivots 100131 csm.jpg|Jen assembling pivots | Image:DB6 Jen assembling pivots 100131 csm.jpg|Jen assembling pivots | ||
− | Image:DB6 Rizzo Siri riveting pivot plates 100131 csm.jpg|Mike Rizzo & Siri riveting pivot plates | + | Image:DB6 Rizzo Siri riveting pivot plates 100131 csm.jpg|Mike Rizzo & Siri Maley riveting pivot plates |
Image:DB6 Schucker planing battery box form 100131 csm.jpg|Foster planing battery box form | Image:DB6 Schucker planing battery box form 100131 csm.jpg|Foster planing battery box form | ||
Image:DB6 Siri fitting CIM 100131 csm.jpg|Siri fitting a CIM | Image:DB6 Siri fitting CIM 100131 csm.jpg|Siri fitting a CIM | ||
Image:DB6 mounted pivot 100131 csm.jpg|Pivot with motor, ready for wiring | Image:DB6 mounted pivot 100131 csm.jpg|Pivot with motor, ready for wiring | ||
Image:DB6 pivots on chassis 100131 csm.jpg|Pivots on chassis | Image:DB6 pivots on chassis 100131 csm.jpg|Pivots on chassis | ||
− | Image:DB6_Wk4_Zain_Dinesh_20100131_SMW_0073.jpg| | + | Image:DB6_Wk4_Zain_Dinesh_20100131_SMW_0073.jpg|Zain and Dinesh programing |
− | Image:DB6_Wk4_Siri_Clem_Scott_20100131_SMW_0071.jpg| | + | Image:DB6_Wk4_Siri_Clem_Scott_20100131_SMW_0071.jpg|Siri Maley, Clem McKown & Scott Featherman testing pivot chains |
− | Image:DB6_Wk4_Scott_Siri_Matt_20100131_SMW_0064.jpg| | + | Image:DB6_Wk4_Scott_Siri_Matt_20100131_SMW_0064.jpg|Scott Featherman, Siri Maley & Matt riveting pivot plates |
− | Image:DB6_Wk4_Siri_20100131_SMW_0046.jpg| | + | Image:DB6_Wk4_Siri_20100131_SMW_0046.jpg|Siri still riveting pivot plates |
− | Image:DB6_Wk4_Siri_20100131_SMW_0057.jpg| | + | Image:DB6_Wk4_Siri_20100131_SMW_0057.jpg|Siri securing mounts for kicker elastic |
− | Image:DB6_Wk4_Siri_20100131_SMW_0058.jpg| | + | Image:DB6_Wk4_Siri_20100131_SMW_0058.jpg|Siri cutting pivot plates for elastic mounts |
− | Image:DB6_Wk4_MikeRizzo_20100131_SMW_0045.jpg| | + | Image:DB6_Wk4_MikeRizzo_20100131_SMW_0045.jpg|Siri maley, Foster Schucker, and Scott Featherman discussing electronics and pneumatics placements |
− | Image:DB6_Wk4_MikeRizzo_20100131_SMW_0051.jpg| | + | Image:DB6_Wk4_MikeRizzo_20100131_SMW_0051.jpg|Mike Rizzo broaching a pivot sprocket keyway |
− | Image:DB6_Wk4_Paul_20100131_SMW_0072.jpg| | + | Image:DB6_Wk4_Paul_20100131_SMW_0072.jpg|Paul programming |
− | Image:DB6_Wk4_MIkeRizzo_20100131_SMW_0043.jpg| | + | Image:DB6_Wk4_MIkeRizzo_20100131_SMW_0043.jpg|Mike Rizzo still broaching keyways |
− | Image:DB6_Wk4_Matt_20100131_SMW_0065.jpg| | + | Image:DB6_Wk4_Matt_20100131_SMW_0065.jpg|Matt riveting more pivot plates |
− | Image:DB6_Wk4_MikeRizzo_20100131_SMW_0044.jpg| | + | Image:DB6_Wk4_MikeRizzo_20100131_SMW_0044.jpg|Mike Rizzo really broaching those keyways |
− | Image:DB6_Wk4_Matt_20100131_SMW_0060.jpg| | + | Image:DB6_Wk4_Matt_20100131_SMW_0060.jpg|Matt Safety Czar with safety glasses and a smile. |
− | Image:DB6_Wk4_Douglas_Jen_20100131_SMW_0055.jpg| | + | Image:DB6_Wk4_Douglas_Jen_20100131_SMW_0055.jpg|Douglas & Jen assembling pivots |
− | Image:DB6_Wk4_Faith_Ken_Dinesh_20100131_SMW_0061.jpg| | + | Image:DB6_Wk4_Faith_Ken_Dinesh_20100131_SMW_0061.jpg|Parts, parts, where are the parts? |
− | Image:DB6_Wk4_Foster_20100131_SMW_0056.jpg| | + | Image:DB6_Wk4_Foster_20100131_SMW_0056.jpg|Foster making the form for the battery box |
− | Image:DB6_Wk4_Jen_20100131_SMW_0053.jpg| | + | Image:DB6_Wk4_Jen_20100131_SMW_0053.jpg|Jen assembling more pivots (Gary Deaver background) |
− | Image:DB6_Wk4_JohnWeissman_MikeRizzo_20100131_SMW_0049.jpg| | + | Image:DB6_Wk4_JohnWeissman_MikeRizzo_20100131_SMW_0049.jpg|John Weissman and Mike Rizzo really, really broaching keyways |
− | Image:DB6_Wk4_Christine_20100131_SMW_0042.jpg| | + | Image:DB6_Wk4_Christine_20100131_SMW_0042.jpg|Christine cutting an electronics panel |
− | Image:DB6_Wk4_DJ_20100131_SMW_0074.jpg| | + | Image:DB6_Wk4_DJ_20100131_SMW_0074.jpg|DJ |
− | Image:DB6_Wk4_Douglas_Jen_20100131_SMW_0052.jpg| | + | Image:DB6_Wk4_Douglas_Jen_20100131_SMW_0052.jpg|Douglas & Jen assembling pivots |
− | Image:DB6_Wk4_Douglas_Jen_20100131_SMW_0054.jpg | | + | Image:DB6_Wk4_Douglas_Jen_20100131_SMW_0054.jpg |Douglas & Jen still hard at work |
− | Image:DB6_Wk4_Andrew_20100131_SMW_0062.jpg| | + | Image:DB6_Wk4_Andrew_20100131_SMW_0062.jpg|Andrew CADing |
− | Image:DB6_Wk4_20100131_SMW_0069.jpg| | + | Image:DB6_Wk4_20100131_SMW_0069.jpg|Clem McKown testing the fist pivot in situ |
− | Image:DB6_Wk4_20100131_SMW_0070.jpg| | + | Image:DB6_Wk4_20100131_SMW_0070.jpg|Siri Maley riveting the first bottom pivot plate |
− | Image:DB6_Wk4_20100131_SMW_0067.jpg| | + | Image:DB6_Wk4_20100131_SMW_0067.jpg|Matt (sort of) removing a rivet shaft from a rivet gun |
− | Image:DB6_Wk4_20100131_SMW_0068.jpg| | + | Image:DB6_Wk4_20100131_SMW_0068.jpg|John Weissman, Clem McKown, Siri Maley & Scott Featherman admiring the first pivot module |
− | Image:DB6_Wk4_20100131_SMW_0048.jpg| | + | Image:DB6_Wk4_20100131_SMW_0048.jpg|Clem McKown riveting a pivot plate |
− | Image:DB6_Wk4_20100131_SMW_0050.jpg| | + | Image:DB6_Wk4_20100131_SMW_0050.jpg|Christine cutting an electronics panel |
− | Image:DB6_Wk4_20100131_SMW_0059.jpg| | + | Image:DB6_Wk4_20100131_SMW_0059.jpg|Gary Deaver drilling a pivot |
− | Image:DB6_Wk4_20100131_SMW_0066.jpg| | + | Image:DB6_Wk4_20100131_SMW_0066.jpg|Matt riveting; Mike Rizzo, Clem McKown, Scott Featherman & Siri Maley considering mounting options |
</gallery> | </gallery> | ||
Line 103: | Line 103: | ||
Image:DB6_1st_drive_100203_csm.jpg|DEWBOT VI's first drive | Image:DB6_1st_drive_100203_csm.jpg|DEWBOT VI's first drive | ||
Image:DB6_over_the_hump_100203_csm.jpg|Preparing to climb over the bump (''you're going to need a bigger boat!'') - we made 4 crossings - 2 forwards & 2 backwards - all safely - & onto concrete landings | Image:DB6_over_the_hump_100203_csm.jpg|Preparing to climb over the bump (''you're going to need a bigger boat!'') - we made 4 crossings - 2 forwards & 2 backwards - all safely - & onto concrete landings | ||
− | Image:DB6_Wk4_20100203_SMW_0037.jpg| | + | Image:DB6_Wk4_20100203_SMW_0037.jpg|Jack and Paul programming. |
− | Image:DB6_Wk4_20100203_SMW_0038.jpg| | + | Image:DB6_Wk4_20100203_SMW_0038.jpg|Media Group hard at work. |
− | Image:DB6_Wk4_20100203_SMW_0039.jpg| | + | Image:DB6_Wk4_20100203_SMW_0039.jpg|Dewbot VI basic wiring. |
− | Image:DB6_Wk4_Ben_20100203_SMW_0028.jpg| | + | Image:DB6_Wk4_Ben_20100203_SMW_0028.jpg|Ben programming. |
− | Image:DB6_Wk4_Matt_MikeRizzo_20100203_SMW_0033.jpg | + | Image:DB6_Wk4_Matt_MikeRizzo_20100203_SMW_0033.jpg|Matt and Mike Rizzo working on chassis. |
− | Image:DB6_Wk4_MIkeRizzo20100203_SMW_0032.jpg| | + | Image:DB6_Wk4_MIkeRizzo20100203_SMW_0032.jpg|Mike Rizzo installing one of eight chains. |
− | Image:DB6_Wk4_20100203_SMW_0030.jpg| | + | Image:DB6_Wk4_20100203_SMW_0030.jpg|The push to get the robot moving. |
− | Image:DB6_Wk4_20100203_SMW_0031.jpg| | + | Image:DB6_Wk4_20100203_SMW_0031.jpg|Ronit working on chassis. |
− | Image:DB6_Wk4_20100203_SMW_0022.jpg| | + | Image:DB6_Wk4_20100203_SMW_0022.jpg|Pivot wheel installed. |
− | Image:DB6_Wk4_20100203_SMW_0024.jpg| | + | Image:DB6_Wk4_20100203_SMW_0024.jpg|Boy, these chains are tough. |
− | Image:DB6_Wk4_20100203_SMW_0025.jpg| | + | Image:DB6_Wk4_20100203_SMW_0025.jpg|Almost connected. Note the magnet mount on the steering drive sprocket for the angle sensor. |
− | Image:DB6_Wk4_20100203_SMW_0036.jpg| | + | Image:DB6_Wk4_20100203_SMW_0036.jpg|Mike Rizzo installing the last chain |
− | Image:DB6_Wk4_20100203_SMW_0026.jpg| | + | Image:DB6_Wk4_20100203_SMW_0026.jpg|Ronit and Ben strategic planning. |
− | Image:DB6_Wk4_20100203_SMW_0027.jpg| | + | Image:DB6_Wk4_20100203_SMW_0027.jpg|more planning. |
− | Image:DB6_Wk4_20100203_SMW_0029.jpg| | + | Image:DB6_Wk4_20100203_SMW_0029.jpg|Ben and Faith McKown |
− | Image:DB6_Wk4_20100203_SMW_0023.jpg| | + | Image:DB6_Wk4_20100203_SMW_0023.jpg|Clem McKown, Jon Davis, Gary Deaver and Matt discussing chassis build. |
− | Image:DB6_Wk4_20100203_SMW_0019.jpg| | + | Image:DB6_Wk4_20100203_SMW_0019.jpg|Come on you can do it! |
− | Image:DB6_Wk4_20100203_SMW_0021.jpg| | + | Image:DB6_Wk4_20100203_SMW_0021.jpg|Dewbot VI clears the top of the bump. |
− | Image:DB6_Wk4_20100203_SMW_0020.jpg| | + | Image:DB6_Wk4_20100203_SMW_0020.jpg|Dewbot VI Made It! |
</gallery> | </gallery> | ||
Line 134: | Line 134: | ||
Image:DB6_Kenneth_on_the_line_100204_csm.jpg|''Kenneth on the line!'' | Image:DB6_Kenneth_on_the_line_100204_csm.jpg|''Kenneth on the line!'' | ||
Image:DB6_Kenneth_100204_csm.jpg|Kenneth | Image:DB6_Kenneth_100204_csm.jpg|Kenneth | ||
− | Image:DB6_Wk4_Cole_20100204_smw.jpg| | + | Image:DB6_Wk4_Cole_20100204_smw.jpg|Cole with spare drive wheel. |
− | Image:DB6_Wk4_Moyer_Cole_20100204_SMW_0007.jpg| | + | Image:DB6_Wk4_Moyer_Cole_20100204_SMW_0007.jpg|Is it smooth enough yet? |
− | Image:DB6_Wk4_X_Matt_20100204_SMW_0013.jpg| | + | Image:DB6_Wk4_X_Matt_20100204_SMW_0013.jpg|Teamwork! |
− | Image: | + | Image:DB6_Wk4_MarkMorun_Souglas_X_20100204_SMW_0001.jpg|Cutting Proxy framework. |
− | Image: | + | Image:DB6_Wk4_Kenneth_20100204_SMW_0009.jpg| Kenneth working on programming 4 wheel pivot drive. |
− | Image: | + | Image:DB6_Wk4_Kenneth_20100204_SMW_0010.jpg|and programming... |
− | Image: | + | Image:DB6_Wk4_Kenneth_20100204_SMW_0018.jpg|and programming... |
− | Image:DB6_Wk4_Kenneth_20100204_SMW_0008.jpg| | + | Image:DB6_Wk4_Kenneth_20100204_SMW_0008.jpg|and programming...boy this is tough! |
− | Image:DB6_Wk4_Foster_Kenneth_20100204_SMW_0004.jpg| | + | Image:DB6_Wk4_Foster_Kenneth_20100204_SMW_0004.jpg|Foster Schucker and Kenneth |
− | Image:DB6_Wk4_Douglas_X_Faith_Matt_20100204_SMW_0016.jpg| | + | Image:DB6_Wk4_Douglas_X_Faith_Matt_20100204_SMW_0016.jpg|Checking measurements for proxy. |
− | Image:DB6_Wk4_Ckem_Moyer_Cole_Ken_20100204_SMW_0006.jpg| | + | Image:DB6_Wk4_Ckem_Moyer_Cole_Ken_20100204_SMW_0006.jpg|Kenneth programing while Clem McKown,Gary Deaver and Cole check out spare pivot wheel. |
− | Image:DB6_Wk4_Clem_Moyer_20100204_SMW_0012.jpg| | + | Image:DB6_Wk4_Clem_Moyer_20100204_SMW_0012.jpg|Clem McKown and Gary Deaver discussing Dewbot VI. |
− | Image:DB6_Wk4_Cole_20100204_SMW_0014.jpg| | + | Image:DB6_Wk4_Cole_20100204_SMW_0014.jpg|Cole cutting proxy chassis framework. |
− | Image:DB6_Wk4_Cole_20100204_SMW_0015.jpg| | + | Image:DB6_Wk4_Cole_20100204_SMW_0015.jpg|Cole inspecting the results. |
− | Image:DB6_Wk4_20100204_SMW_0002.jpg| | + | Image:DB6_Wk4_20100204_SMW_0002.jpg| Group admiring Dewbot VI progress. |
− | Image:DB6_Wk4_20100204_SMW_0003.jpg| | + | Image:DB6_Wk4_20100204_SMW_0003.jpg|Dewbot VI with bumpers waiting for programing. |
− | Image:DB6_Wk4_20100204_SMW_0017.jpg| | + | Image:DB6_Wk4_20100204_SMW_0017.jpg|Dewbot VI with Control panel. |
</gallery> | </gallery> | ||
Line 158: | Line 158: | ||
image:DB6_Matt_Faith_Deaver_100205_csm.jpg|Matt, Faith Mckown & Gary Deaver cut aluminum for the ''proxy chassis'' | image:DB6_Matt_Faith_Deaver_100205_csm.jpg|Matt, Faith Mckown & Gary Deaver cut aluminum for the ''proxy chassis'' | ||
image:DB6_proxy_chassis_100205_csm.jpg|Proxy Chassis | image:DB6_proxy_chassis_100205_csm.jpg|Proxy Chassis | ||
− | image:DB6_Carly_Nichole_100205_csm.jpg|Carly & | + | image:DB6_Carly_Nichole_100205_csm.jpg|Carly & Nicole |
image:DB6_Schucker_BenR_Kenneth_100205_csm.jpg|Programming team - Foster Schucker with Ben R & Kenneth | image:DB6_Schucker_BenR_Kenneth_100205_csm.jpg|Programming team - Foster Schucker with Ben R & Kenneth | ||
</gallery> | </gallery> | ||
== Saturday February 6, 2010 == | == Saturday February 6, 2010 == | ||
+ | '''No pictures today, Downingtown got 16" of snow!''' The robot shop was closed, we will start Week 5 on Sunday. | ||
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> | ||
</gallery> | </gallery> | ||
---- | ---- | ||
− | [[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]] | + | [[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]][[Category:Photo Galleries]] |
Latest revision as of 00:37, 4 March 2010
Contents
Sunday January 31, 2010
Monday February 1, 2010
Tuesday February 2, 2010
Wednesday February 3, 2010
Thursday February 4, 2010
Friday February 5, 2010
Saturday February 6, 2010
No pictures today, Downingtown got 16" of snow! The robot shop was closed, we will start Week 5 on Sunday.