Difference between revisions of "DEWBOT V Week Two Build Season Photo Gallery"

From DEW Robotics
Jump to: navigation, search
Line 1: Line 1:
<gallery widths=250 heights=250>
+
<gallery widths=250 heights=250 perrow=3>
 
File:DB5_frame_rear_on_form_090111_csm_1.jpg|Rear frame pieces clamped to form in preparation for welding
 
File:DB5_frame_rear_on_form_090111_csm_1.jpg|Rear frame pieces clamped to form in preparation for welding
 
File:DB5_Klufas_Schucker_hopper_proto_base_090112_csm.jpg|Matt Klufas with Foster Schucker cutting hopper prototype base
 
File:DB5_Klufas_Schucker_hopper_proto_base_090112_csm.jpg|Matt Klufas with Foster Schucker cutting hopper prototype base

Revision as of 17:25, 20 June 2009