Difference between revisions of "DEWBOT X Week Two Build Season Photo Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) (→Tuesday January 14, 2014) |
MaiKangWei (talk | contribs) (→Wednesday January 15, 2014) |
||
Line 25: | Line 25: | ||
==Wednesday January 15, 2014== | ==Wednesday January 15, 2014== | ||
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> | ||
− | image:DBX_140115_csm-1.jpg| | + | image:DBX_140115_csm-1.jpg|Michael Geldart, Gary Deaver & Michael work on roller-frame deployment |
− | image:DBX_140115_csm-2.jpg| | + | image:DBX_140115_csm-2.jpg|Slingshot launch - from a series of 30 photographs takes over the span of 1 second |
− | image:DBX_140115_csm-3.jpg| | + | image:DBX_140115_csm-3.jpg|The next photo - 1/30<sup>th</sup> of a second later |
− | image:DBX_140115_csm-4.jpg| | + | image:DBX_140115_csm-4.jpg|Andrew Weissman & Gary Deaver |
− | image:DBX_140115_csm-5.jpg| | + | image:DBX_140115_csm-5.jpg|Mackenzie & Kira |
− | image:DBX_140115_csm-6.jpg| | + | image:DBX_140115_csm-6.jpg|Lucy |
− | image:DBX_140115_csm-7.jpg| | + | image:DBX_140115_csm-7.jpg|Work in slingshot |
− | image:DBX_140115_csm-8.jpg| | + | image:DBX_140115_csm-8.jpg|Putting wheels on the field goal |
− | image:DBX_140115_csm-9.jpg| | + | image:DBX_140115_csm-9.jpg|Lucy |
</gallery> | </gallery> | ||