Difference between revisions of "FTC 7314 Engineering Notebook 2015-09-28"
From DEW Robotics
Akhila2014 (talk | contribs) (→Competition Season Meeting) |
TheBadJosh (talk | contribs) |
||
Line 20: | Line 20: | ||
| | | | ||
* Bennett continued to build the debris lift prototype. | * Bennett continued to build the debris lift prototype. | ||
− | * Josh worked with Bennett in order to teach him how to use the drill press and they were able to complete drilling the walls of the conveyor in so that they were | + | * Josh worked with Bennett in order to teach him how to use the drill press and they were able to complete drilling the walls of the conveyor in so that they were preperered for the tank treads. |
|- | |- | ||
| '''Drive-train''' | | '''Drive-train''' |
Revision as of 03:30, 30 November 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
28-September-2015 | 6:00-8:00pm | TCHS Brandywine | Trevor, Myles, Josh, Bennett, Amal, Trent, Braden, Jacob |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Conveyor Frame prototype |
|
Drive-train |
|
Tasks | Reflections |
---|---|
Drive Train |
|
Justin, Josh, Bennet made a piece for the conveyer that will collect the scoring elements. |
|
Action and idea Journal
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|