Modified Pi 3 case to fit on top of existing Ethernet Switch | Modified Pi 3 case to fit on top of existing Ethernet Switch | ||
− | [[File:Custom | + | I finished the CAD for the Pi 3 Case. It is ready for 3D Printing. |
+ | Here it is: | ||
+ | [[File:Custom Pi3 Case.jpg]] | ||
+ | |||
+ | On top of the Pi 3 Case being completed, two Flanges and the remaining timing pulleys were completed. | ||
+ | |||
+ | Bumpers were redone to accommodate the welds on the side of the chassis, drawings were printed, and work on the tangible bumpers is now underway! - Madi | ||
==Mechanical== | ==Mechanical== |
Latest revision as of 17:32, 19 February 2017
Contents
CAD & Design
CAM Lead- Patrick
Started printing the first of four Flanges meant to go onto the climbing system. Each Flange takes 2:30 hrs to print. Meanwhile other parts that need printing are:
6 17-tooth timing pulleys
Talon covers
Housing Cases for all on-board cameras (cameras for this year are undecided)
Modified Pi 3 case to fit on top of existing Ethernet Switch
I finished the CAD for the Pi 3 Case. It is ready for 3D Printing. Here it is:
On top of the Pi 3 Case being completed, two Flanges and the remaining timing pulleys were completed.
Bumpers were redone to accommodate the welds on the side of the chassis, drawings were printed, and work on the tangible bumpers is now underway! - Madi