STEAMworks Meeting - 4-Feb-2017

From DEW Robotics
Jump to: navigation, search

<< PREVIOUS -- NEXT>>
PHOTOS

CAD & Design

Mechanical

Swerve Modules - A great deal of progress was made in finishing machining and early assembly of the swerve modules:

  • Pivot top/tube weldments were processed on the CNC lathe to: 1) turn the welded surface down to flat; 2) Bore a hole for the bottom needle bearing; and ream the bottom needle bearing hole to the finished dimension.
  • Bolt holes in Pivot Side Plates were countersunk.
  • Bearing holes in the module top plate (1 hole) and bottom plate (2 holes) were finished for tight fit using the Boring Tool. Holes needing tapping were tapped (by hand).
  • Two additional old swerve modules were disassembled - mining for COTS.
  • The transfer axles were assembled.
  • We found the long-lost sensor flex couplings
  • Bearings (1" & 1/2" flanged) were pressed into the module bottom plate
  • Top bearing mounts were 3-d printed
  • CVT pulleys were 3-d printed
  • Started mounting top bearings into module top plate. (3) finished (more bolts needed - we neglected to purchase these).
  • Pressed needle bearings into the top and bottom of the Pivot Tube.

Shooter - Assembled next gen shooter including angle-adjustment hood.

Chassis - Deux's chassis welded (as far as is designed). Prime's chassis welding is well under way.

Ball Storage - Modeled the robot ball storage in cardboard. It holds about 60 balls. Actual will be less. We also tested loading from the human player station.

Electronics Panel - Carbon fiber composite laid up for the electronics panel.

Intake - Intake wheels cut on CNC Router.

- Clem McKown