MaiKangWei (talk | contribs) (Created page with "<big> << PREVIOUS -- NEXT>></big><br> <big>DEWBOT_XIII_Week_Four_Build_Season_Photo_Gallery#Saturd...") |
MaiKangWei (talk | contribs) (→Mechanical) |
||
Line 5: | Line 5: | ||
==Mechanical== | ==Mechanical== | ||
+ | '''Swerve Pivots''' - A great deal of progress was made in finishing machining and early assembly of the swerve modules: | ||
+ | *Pivot top/tube weldments were processed on the CNC lathe to: 1) turn the welded surface down to flat; 2) Bore a hole for the bottom needle bearing; and ream the bottom needle bearing hole to the finished dimension. | ||
+ | *Bearing holes in the module top plate (1 hole) and bottom plate (2 holes) were finished for tight fit using the Boring Tool. Holes needing tapping were tapped (by hand). | ||
+ | *Two additional old swerve modules were disassembled - mining for COTS. | ||
+ | *The transfer axles were assembled. | ||
+ | *We found the long-lost sensor flex couplings | ||
+ | *Bearings (1" & 1/2" flanged) were pressed into the module bottom plate | ||
+ | *Top bearing mounts were 3-d printed | ||
+ | *CVT pulleys were 3-d printed | ||
+ | *Started mounting top bearings into module top plate. (3) finished (more bolts needed - we neglected to purchase these). | ||
+ | *Pressed needle bearings into the top and bottom of the Pivot Tube. | ||
+ | |||
+ | '''Shooter''' - Assembled next gen shooter including angle-adjustment hood. | ||
+ | |||
+ | '''Chassis''' - Deux's chassis welded (as far as is designed). Prime's chassis welding is well under way. | ||
+ | |||
+ | '''Ball Storage''' - Modeled the robot ball storage in cardboard. It holds about 60 balls. Actual will be less. | ||
+ | |||
+ | '''Electronics Panel''' - Carbon fiber composite laid up for the electronics panel. | ||
+ | |||
+ | '''Intake''' - Intake wheels cut on CNC Router. | ||
==Programming== | ==Programming== |
Revision as of 14:07, 5 February 2017
Contents
CAD & Design
Mechanical
Swerve Pivots - A great deal of progress was made in finishing machining and early assembly of the swerve modules:
- Pivot top/tube weldments were processed on the CNC lathe to: 1) turn the welded surface down to flat; 2) Bore a hole for the bottom needle bearing; and ream the bottom needle bearing hole to the finished dimension.
- Bearing holes in the module top plate (1 hole) and bottom plate (2 holes) were finished for tight fit using the Boring Tool. Holes needing tapping were tapped (by hand).
- Two additional old swerve modules were disassembled - mining for COTS.
- The transfer axles were assembled.
- We found the long-lost sensor flex couplings
- Bearings (1" & 1/2" flanged) were pressed into the module bottom plate
- Top bearing mounts were 3-d printed
- CVT pulleys were 3-d printed
- Started mounting top bearings into module top plate. (3) finished (more bolts needed - we neglected to purchase these).
- Pressed needle bearings into the top and bottom of the Pivot Tube.
Shooter - Assembled next gen shooter including angle-adjustment hood.
Chassis - Deux's chassis welded (as far as is designed). Prime's chassis welding is well under way.
Ball Storage - Modeled the robot ball storage in cardboard. It holds about 60 balls. Actual will be less.
Electronics Panel - Carbon fiber composite laid up for the electronics panel.
Intake - Intake wheels cut on CNC Router.