'''Swerve Pivots''' - A great deal of progress was made in finishing machining and early assembly of the swerve modules:
+
'''Swerve Modules''' - A great deal of progress was made in finishing machining and early assembly of the swerve modules:
 
*Pivot top/tube weldments were processed on the CNC lathe to: 1) turn the welded surface down to flat; 2) Bore a hole for the bottom needle bearing; and ream the bottom needle bearing hole to the finished dimension.
 
*Pivot top/tube weldments were processed on the CNC lathe to: 1) turn the welded surface down to flat; 2) Bore a hole for the bottom needle bearing; and ream the bottom needle bearing hole to the finished dimension.
 
*Bearing holes in the module top plate (1 hole) and bottom plate (2 holes) were finished for tight fit using the Boring Tool.  Holes needing tapping were tapped (by hand).
 
*Bearing holes in the module top plate (1 hole) and bottom plate (2 holes) were finished for tight fit using the Boring Tool.  Holes needing tapping were tapped (by hand).

Revision as of 14:09, 5 February 2017

<< PREVIOUS -- NEXT>>
PHOTOS

CAD & Design

Mechanical

Swerve Modules - A great deal of progress was made in finishing machining and early assembly of the swerve modules:

  • Pivot top/tube weldments were processed on the CNC lathe to: 1) turn the welded surface down to flat; 2) Bore a hole for the bottom needle bearing; and ream the bottom needle bearing hole to the finished dimension.
  • Bearing holes in the module top plate (1 hole) and bottom plate (2 holes) were finished for tight fit using the Boring Tool. Holes needing tapping were tapped (by hand).
  • Two additional old swerve modules were disassembled - mining for COTS.
  • The transfer axles were assembled.
  • We found the long-lost sensor flex couplings
  • Bearings (1" & 1/2" flanged) were pressed into the module bottom plate
  • Top bearing mounts were 3-d printed
  • CVT pulleys were 3-d printed
  • Started mounting top bearings into module top plate. (3) finished (more bolts needed - we neglected to purchase these).
  • Pressed needle bearings into the top and bottom of the Pivot Tube.

Shooter - Assembled next gen shooter including angle-adjustment hood.

Chassis - Deux's chassis welded (as far as is designed). Prime's chassis welding is well under way.

Ball Storage - Modeled the robot ball storage in cardboard. It holds about 60 balls. Actual will be less. We also tested loading from the human player station.

Electronics Panel - Carbon fiber composite laid up for the electronics panel.

Intake - Intake wheels cut on CNC Router.