Difference between revisions of "Stronghold Meeting -03-Feb-2016"
From DEW Robotics
(Created page with '=='''Competition Season Meeting'''== <!-- This is the meeting information table --> {|border=1 cellpadding="10" !Meeting Date !!Meeting Time !!Location !!Attendees |- | | | TC...') |
(→Programming) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | <big>[[Stronghold Meeting -02-Feb-2016 | << PREVIOUS]] -- [[Stronghold Meeting -04-Feb-2016 | NEXT>>]] -- [[DEWBOT_XII_Week_Four_Build_Season_Photo_Gallery#Wednesday_February_3.2C_2016 |PHOTOS]] </big> | ||
+ | |||
=='''Competition Season Meeting'''== | =='''Competition Season Meeting'''== | ||
Line 11: | Line 13: | ||
|} | |} | ||
==CAD & Design== | ==CAD & Design== | ||
+ | Tonight we determined that our previous chassis design would not be suitable for our catapult, and so we have decided to redesign. The new chassis will give adequate space for the catapult, and work on the electronics board was started. | ||
==Mechanical== | ==Mechanical== | ||
==Programming== | ==Programming== | ||
+ | |||
+ | - We worked on power management | ||
+ | |||
+ | :- We logged the voltage and current from the PDP and graphed it in excel | ||
+ | |||
+ | :- We ran the robot into an immovable object to see how the voltage and current responded. | ||
==Strategy== | ==Strategy== | ||
Line 37: | Line 46: | ||
|<br /><br /> | |<br /><br /> | ||
|} | |} | ||
+ | |||
+ | <big>[[Stronghold Meeting -02-Feb-2016 | << PREVIOUS]] -- [[Stronghold Meeting -04-Feb-2016 | NEXT>>]] -- [[DEWBOT_XII_Week_Four_Build_Season_Photo_Gallery#Wednesday_February_3.2C_2016 |PHOTOS]] </big> | ||
+ | |||
---- | ---- | ||
[[Category:DEWBOT XII]][[Category:Engineering]] | [[Category:DEWBOT XII]][[Category:Engineering]] |
Latest revision as of 19:20, 16 February 2016
<< PREVIOUS -- NEXT>> -- PHOTOS
Contents
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
TCHS Brandywine |
CAD & Design
Tonight we determined that our previous chassis design would not be suitable for our catapult, and so we have decided to redesign. The new chassis will give adequate space for the catapult, and work on the electronics board was started.
Mechanical
Programming
- We worked on power management
- - We logged the voltage and current from the PDP and graphed it in excel
- - We ran the robot into an immovable object to see how the voltage and current responded.
Strategy
Field Elements
Other
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|
<< PREVIOUS -- NEXT>> -- PHOTOS