Stronghold Meeting -03-Feb-2016

From DEW Robotics
Jump to: navigation, search

<< PREVIOUS -- NEXT>> -- PHOTOS

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
TCHS Brandywine

CAD & Design

Tonight we determined that our previous chassis design would not be suitable for our catapult, and so we have decided to redesign. The new chassis will give adequate space for the catapult, and work on the electronics board was started.

Mechanical

Programming

- We worked on power management

- We logged the voltage and current from the PDP and graphed it in excel
- We ran the robot into an immovable object to see how the voltage and current responded.

Strategy

Field Elements

Other



Recorded by: Date: Journal Editor: Date:








<< PREVIOUS -- NEXT>> -- PHOTOS