Difference between revisions of "DEC Second Bay Gallery"

From DEW Robotics
Jump to: navigation, search
 
(12 intermediate revisions by 2 users not shown)
Line 1: Line 1:
24-November-2009 move into second bay in the [[Downingtown Educational Center]] Shop.  
+
Photos from the 24-November-2009 move into second bay in the [[Downingtown Educational Center]] Shop.  
  
 
<gallery widths=250 heights=250 perrow=3>
 
<gallery widths=250 heights=250 perrow=3>
 
Image:Shelf_asm_Carly_Selina_Jack_091124_csm.jpg|Carly, Selina & Jack starting to assemble VRC shelves
 
Image:Shelf_asm_Carly_Selina_Jack_091124_csm.jpg|Carly, Selina & Jack starting to assemble VRC shelves
 
Image:Shelf_asm_Siri_Carly_Selina_091124_csm.jpg|Siri, Carly & Selina adding another shelf
 
Image:Shelf_asm_Siri_Carly_Selina_091124_csm.jpg|Siri, Carly & Selina adding another shelf
Image:Shelf_asm_MattK_Cole_Douglas_091124_csm.jpg|Matt K, Cole & Douglas assembling VRC shelves
 
 
Image:Alex_drilling_091124_csm.jpg|Alex drilling pivot hole for new bay gate
 
Image:Alex_drilling_091124_csm.jpg|Alex drilling pivot hole for new bay gate
 
Image:Deaver_Alex_installing_gate_091124_csm.jpg|Gary Deaver & Alex installing the new gate
 
Image:Deaver_Alex_installing_gate_091124_csm.jpg|Gary Deaver & Alex installing the new gate
 
Image:Schucker_Carly_Siri_shelves_091124_csm.jpg|Foster Schucker, Carly & Siry positioning VRC shelves
 
Image:Schucker_Carly_Siri_shelves_091124_csm.jpg|Foster Schucker, Carly & Siry positioning VRC shelves
 +
Image:Zain_Max_Paul_Michael_programming_team_091124_csm.jpg|Programming Team - Zain, Max, Paul & Michael
 
Image:Moyer_Andrew_physical_inventory_091124_csm.jpg|David Moyer & Andrew taking physical inventory of stocks
 
Image:Moyer_Andrew_physical_inventory_091124_csm.jpg|David Moyer & Andrew taking physical inventory of stocks
 +
Image:Siri_Deaver_Cole_Carly_091124_csm.jpg|Cole & Gary Deaver install gate
 +
Image:Murph_instructing_091124_csm.jpg|Murph instructing Vexters
 
Image:Murph_drilling_091124_csm.jpg|Murph drilling
 
Image:Murph_drilling_091124_csm.jpg|Murph drilling
 +
Image:MattK_moving_Horizontal_bandsaw_091124_csm.jpg|Matt K moving the horizontal bandsaw
 +
Image:BenR_Nichole_programming_team_091124_csm.jpg|Programming Team in Muppet Lab - Ben R & Nicole
 
Image:Siri_McKown_Murph_shifting_stores_091124_csm.jpg|Siri, Clem McKown & Murph shifting Aluminum plate stores
 
Image:Siri_McKown_Murph_shifting_stores_091124_csm.jpg|Siri, Clem McKown & Murph shifting Aluminum plate stores
 +
Image:Vex_wall_091202_csm.jpg|Vex Wall
 +
Image:Ghosts_of_robots_past_091209_csm.jpg|Old robots on rack in the new bay
 
</gallery>
 
</gallery>
 
----
 
----
[[Category:Events]][[Category:DEWBOT VI]]
+
[[Category:Events]][[Category:DEWBOT VI]][[Category:Photo Galleries]]

Latest revision as of 16:37, 15 February 2011

Photos from the 24-November-2009 move into second bay in the Downingtown Educational Center Shop.