Difference between revisions of "DEC Second Bay Gallery"

From DEW Robotics
Jump to: navigation, search
Line 4: Line 4:
 
Image:Shelf_asm_Carly_Selina_Jack_091124_csm.jpg|Carly, Selina & Jack starting to assemble VRC shelves
 
Image:Shelf_asm_Carly_Selina_Jack_091124_csm.jpg|Carly, Selina & Jack starting to assemble VRC shelves
 
Image:Shelf_asm_Siri_Carly_Selina_091124_csm.jpg|Siri, Carly & Selina adding another shelf
 
Image:Shelf_asm_Siri_Carly_Selina_091124_csm.jpg|Siri, Carly & Selina adding another shelf
Image:Shelf_asm_MattK_Cole_Douglas_091124_csm.jpg|Matt K, Cole & Douglas assembling VRC shelves
+
 
 
Image:Alex_drilling_091124_csm.jpg|Alex drilling pivot hole for new bay gate
 
Image:Alex_drilling_091124_csm.jpg|Alex drilling pivot hole for new bay gate
 
Image:Deaver_Alex_installing_gate_091124_csm.jpg|Gary Deaver & Alex installing the new gate
 
Image:Deaver_Alex_installing_gate_091124_csm.jpg|Gary Deaver & Alex installing the new gate

Revision as of 02:25, 26 November 2009

Photos from the 24-November-2009 move into second bay in the Downingtown Educational Center Shop.