Difference between revisions of "DEWBOT II Build"
From DEW Robotics
MaiKangWei (talk | contribs) |
MaiKangWei (talk | contribs) |
||
Line 22: | Line 22: | ||
===Week Two - Complete prototyping, robot design & begin build (1/15-1/21)=== | ===Week Two - Complete prototyping, robot design & begin build (1/15-1/21)=== | ||
* Prototyped Ball Shooter | * Prototyped Ball Shooter | ||
− | * Lift design | + | * Lift design finished in AutoCad |
+ | * Lift construction seriously underway | ||
* Building gets underway | * Building gets underway | ||
Revision as of 20:23, 22 August 2009
Our build process is divided into the following five stages:
- Brainstorming & Goal Setting
- Prototyping
- Designing
- Building
- Testing, Debugging & Training
We prototyped the following features:
- Ball Lift
- Ball Shooter
Contents
- 1 Week One - Brainstorm, Prototype & Research (1/8-1/14)
- 2 Week Two - Complete prototyping, robot design & begin build (1/15-1/21)
- 3 Week Three - Robot design, part fabrication & build (1/22-1/28)
- 4 Week Four - Transitions Continue (1/29-2/4)
- 5 Week Five - Build (2/5-2/11)
- 6 Week Six to Finish - Finish Build - Test & Debug (2/12-2/21)
Week One - Brainstorm, Prototype & Research (1/8-1/14)
- Brainstorm session on 1/8
- Build sub-teams
- Inventoried & organized the Kit of Parts
- Started prototyping & testing:
- Ball Lift
- Ball Shooter
Week Two - Complete prototyping, robot design & begin build (1/15-1/21)
- Prototyped Ball Shooter
- Lift design finished in AutoCad
- Lift construction seriously underway
- Building gets underway
Week Three - Robot design, part fabrication & build (1/22-1/28)
- First Drawings out
- Electrical panel design
- Majority of part fabrication (metal cutting) done
- Assembly started on
- Electrical Panel
- Chassis
Week Four - Transitions Continue (1/29-2/4)
- All work is parallel design & build
Week Five - Build (2/5-2/11)
Week Six to Finish - Finish Build - Test & Debug (2/12-2/21)
- Start
- Testing
- Identifying & fixing bugs