Our build process is divided into the following five stages:
+
[[Image:DB2_wire_frame 060130_csm.jpg|550px|right|text|top|thumb|AutoCAD wire-frame model of lift & hopper]]Our build process is divided into the following five stages:
*Brainstorming & Strategic Goal Setting
+
* Brainstorming & Goal Setting
*Prototyping and Tactic (Game-Play) Development
+
* Prototyping
*Designing
+
* Designing
*Building
+
* Building
*Testing, Debugging & Training
+
* Testing, Debugging & Training
  
 
We prototyped the following features:
 
We prototyped the following features:
*Ball Lift
+
* Ball Lift
*Ball Shooter
+
* Ball Shooter
 +
* Feed to Ball Shooter
 +
 
 +
We designed in AutoCAD (not Inventor):
 +
* Ball Lift
 +
* Hopper
 +
* Feed Chute
 +
* The mount and integration of the Shooter with the robot, including the ''"ski jump"''
  
 
===Week One - Brainstorm, Prototype & Research (1/8-1/14)===
 
===Week One - Brainstorm, Prototype & Research (1/8-1/14)===
 
* Brainstorm session on 1/8
 
* Brainstorm session on 1/8
* Inventoried the Kit of Parts
+
* Build sub-teams
 +
* Inventoried & organized the Kit of Parts
 
* Started prototyping & testing:
 
* Started prototyping & testing:
 
:* Ball Lift
 
:* Ball Lift
Line 19: Line 27:
 
;[[DEWBOT II Week One Build Season Photo Gallery|Week One Photo Gallery]]
 
;[[DEWBOT II Week One Build Season Photo Gallery|Week One Photo Gallery]]
  
===Week Two - Complete prototyping, robot design & begin build (1/15-1/21===
+
===Week Two - Complete prototyping, robot design & begin build (1/15-1/21)===
* Prototyped Ball Shooter
+
* Lift designed using AutoCad
* Lift design underway in AutoCad
+
* Lift construction seriously underway
 
* Building gets underway
 
* Building gets underway
  
Line 27: Line 35:
  
 
===Week Three - Robot design, part fabrication & build (1/22-1/28)===
 
===Week Three - Robot design, part fabrication & build (1/22-1/28)===
* First Drawings out
+
* Prototyped Ball Shooter
* Electrical panel design
+
* Learn how to join latex tube ends to make ball lift cords
* Majority of part fabrication (metal cutting) done
+
* Build & Test Ball Lift
* Assembly started on
+
* Build Ramp (Field Equipment)
:* Electrical Panel
 
:* Chassis
 
  
 
;[[DEWBOT II Week Three Build Season Photo Gallery|Week Three Photo Gallery]]
 
;[[DEWBOT II Week Three Build Season Photo Gallery|Week Three Photo Gallery]]
  
===Week Four - Transitions Continue (1/29-2/4)===
+
===Week Four - Build (1/29-2/4)===
* All work is parallel design & build
+
* Drive wheels, gearboxes & motors mounted
 +
* Shooter assembled off robot
 +
* Ball lift mounted onto robot
 +
* Team logo created
 +
* Ball feed to shooter prototyped
 +
* Hopper built
 +
* Bumpers started
  
 
;[[DEWBOT II Week Four Build Season Photo Gallery|Week Four Photo Gallery]]
 
;[[DEWBOT II Week Four Build Season Photo Gallery|Week Four Photo Gallery]]
  
 
===Week Five - Build (2/5-2/11)===
 
===Week Five - Build (2/5-2/11)===
 +
* Shooter Feed Chute designed & built
 +
* Mounted
 +
:* Hopper
 +
:* Shooter
 +
:* Shooter Feed Chute
 +
:* Limit switches
 +
* Wiring completed
 +
* Built bumpers
 +
* ''Mechanically & Electrically complete''
  
 
;[[DEWBOT II Week Five Build Season Photo Gallery|Week Five Photo Gallery]]
 
;[[DEWBOT II Week Five Build Season Photo Gallery|Week Five Photo Gallery]]
  
===Week Six to Finish - Finish Build - Test & Debug (2/12-2/21)===
+
===Week Six to Finish - Test, Tweak, Fix, Lightweight & Debug (2/12-2/21)===
* Start
+
* Testing
:* Testing
+
* Identifying & fixing bugs
:* Identifying & fixing bugs
+
* Replaced front swivel wheels with omni wheels
 +
* DEWBOT II went on a diet
 +
* Driver / Operator practice
  
;[[DEWBOT II Week Six Build Season Photo Gallery|Week Six Photo Gallery]]
+
;[[DEWBOT II Week Six & c. Build Season Photo Gallery|Week Six & c. Photo Gallery]]
  
 
----
 
----
 
[[Category:Robot]][[Category:DEWBOT II]]
 
[[Category:Robot]][[Category:DEWBOT II]]

Latest revision as of 23:42, 23 August 2009

AutoCAD wire-frame model of lift & hopper
Our build process is divided into the following five stages:
  • Brainstorming & Goal Setting
  • Prototyping
  • Designing
  • Building
  • Testing, Debugging & Training

We prototyped the following features:

  • Ball Lift
  • Ball Shooter
  • Feed to Ball Shooter

We designed in AutoCAD (not Inventor):

  • Ball Lift
  • Hopper
  • Feed Chute
  • The mount and integration of the Shooter with the robot, including the "ski jump"

Week One - Brainstorm, Prototype & Research (1/8-1/14)

  • Brainstorm session on 1/8
  • Build sub-teams
  • Inventoried & organized the Kit of Parts
  • Started prototyping & testing:
  • Ball Lift
  • Ball Shooter
Week One Photo Gallery

Week Two - Complete prototyping, robot design & begin build (1/15-1/21)

  • Lift designed using AutoCad
  • Lift construction seriously underway
  • Building gets underway
Week Two Photo Gallery

Week Three - Robot design, part fabrication & build (1/22-1/28)

  • Prototyped Ball Shooter
  • Learn how to join latex tube ends to make ball lift cords
  • Build & Test Ball Lift
  • Build Ramp (Field Equipment)
Week Three Photo Gallery

Week Four - Build (1/29-2/4)

  • Drive wheels, gearboxes & motors mounted
  • Shooter assembled off robot
  • Ball lift mounted onto robot
  • Team logo created
  • Ball feed to shooter prototyped
  • Hopper built
  • Bumpers started
Week Four Photo Gallery

Week Five - Build (2/5-2/11)

  • Shooter Feed Chute designed & built
  • Mounted
  • Hopper
  • Shooter
  • Shooter Feed Chute
  • Limit switches
  • Wiring completed
  • Built bumpers
  • Mechanically & Electrically complete
Week Five Photo Gallery

Week Six to Finish - Test, Tweak, Fix, Lightweight & Debug (2/12-2/21)

  • Testing
  • Identifying & fixing bugs
  • Replaced front swivel wheels with omni wheels
  • DEWBOT II went on a diet
  • Driver / Operator practice
Week Six & c. Photo Gallery