Difference between revisions of "DEWBOT II Build"
From DEW Robotics
MaiKangWei (talk | contribs) (→Week Two - Complete prototyping, robot design & begin build (1/15-1/21)) |
MaiKangWei (talk | contribs) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Our build process is divided into the following five stages: | + | [[Image:DB2_wire_frame 060130_csm.jpg|550px|right|text|top|thumb|AutoCAD wire-frame model of lift & hopper]]Our build process is divided into the following five stages: |
− | *Brainstorming & Goal Setting | + | * Brainstorming & Goal Setting |
− | *Prototyping | + | * Prototyping |
− | *Designing | + | * Designing |
− | *Building | + | * Building |
− | *Testing, Debugging & Training | + | * Testing, Debugging & Training |
We prototyped the following features: | We prototyped the following features: | ||
− | *Ball Lift | + | * Ball Lift |
− | *Ball Shooter | + | * Ball Shooter |
+ | * Feed to Ball Shooter | ||
+ | |||
+ | We designed in AutoCAD (not Inventor): | ||
+ | * Ball Lift | ||
+ | * Hopper | ||
+ | * Feed Chute | ||
+ | * The mount and integration of the Shooter with the robot, including the ''"ski jump"'' | ||
===Week One - Brainstorm, Prototype & Research (1/8-1/14)=== | ===Week One - Brainstorm, Prototype & Research (1/8-1/14)=== | ||
Line 35: | Line 42: | ||
;[[DEWBOT II Week Three Build Season Photo Gallery|Week Three Photo Gallery]] | ;[[DEWBOT II Week Three Build Season Photo Gallery|Week Three Photo Gallery]] | ||
− | ===Week Four - | + | ===Week Four - Build (1/29-2/4)=== |
− | * | + | * Drive wheels, gearboxes & motors mounted |
+ | * Shooter assembled off robot | ||
+ | * Ball lift mounted onto robot | ||
+ | * Team logo created | ||
+ | * Ball feed to shooter prototyped | ||
+ | * Hopper built | ||
+ | * Bumpers started | ||
;[[DEWBOT II Week Four Build Season Photo Gallery|Week Four Photo Gallery]] | ;[[DEWBOT II Week Four Build Season Photo Gallery|Week Four Photo Gallery]] | ||
===Week Five - Build (2/5-2/11)=== | ===Week Five - Build (2/5-2/11)=== | ||
+ | * Shooter Feed Chute designed & built | ||
+ | * Mounted | ||
+ | :* Hopper | ||
+ | :* Shooter | ||
+ | :* Shooter Feed Chute | ||
+ | :* Limit switches | ||
+ | * Wiring completed | ||
+ | * Built bumpers | ||
+ | * ''Mechanically & Electrically complete'' | ||
;[[DEWBOT II Week Five Build Season Photo Gallery|Week Five Photo Gallery]] | ;[[DEWBOT II Week Five Build Season Photo Gallery|Week Five Photo Gallery]] | ||
− | ===Week Six to Finish | + | ===Week Six to Finish - Test, Tweak, Fix, Lightweight & Debug (2/12-2/21)=== |
− | + | * Testing | |
− | + | * Identifying & fixing bugs | |
− | + | * Replaced front swivel wheels with omni wheels | |
+ | * DEWBOT II went on a diet | ||
+ | * Driver / Operator practice | ||
;[[DEWBOT II Week Six & c. Build Season Photo Gallery|Week Six & c. Photo Gallery]] | ;[[DEWBOT II Week Six & c. Build Season Photo Gallery|Week Six & c. Photo Gallery]] |
Latest revision as of 23:42, 23 August 2009
Our build process is divided into the following five stages:- Brainstorming & Goal Setting
- Prototyping
- Designing
- Building
- Testing, Debugging & Training
We prototyped the following features:
- Ball Lift
- Ball Shooter
- Feed to Ball Shooter
We designed in AutoCAD (not Inventor):
- Ball Lift
- Hopper
- Feed Chute
- The mount and integration of the Shooter with the robot, including the "ski jump"
Contents
- 1 Week One - Brainstorm, Prototype & Research (1/8-1/14)
- 2 Week Two - Complete prototyping, robot design & begin build (1/15-1/21)
- 3 Week Three - Robot design, part fabrication & build (1/22-1/28)
- 4 Week Four - Build (1/29-2/4)
- 5 Week Five - Build (2/5-2/11)
- 6 Week Six to Finish - Test, Tweak, Fix, Lightweight & Debug (2/12-2/21)
Week One - Brainstorm, Prototype & Research (1/8-1/14)
- Brainstorm session on 1/8
- Build sub-teams
- Inventoried & organized the Kit of Parts
- Started prototyping & testing:
- Ball Lift
- Ball Shooter
Week Two - Complete prototyping, robot design & begin build (1/15-1/21)
- Lift designed using AutoCad
- Lift construction seriously underway
- Building gets underway
Week Three - Robot design, part fabrication & build (1/22-1/28)
- Prototyped Ball Shooter
- Learn how to join latex tube ends to make ball lift cords
- Build & Test Ball Lift
- Build Ramp (Field Equipment)
Week Four - Build (1/29-2/4)
- Drive wheels, gearboxes & motors mounted
- Shooter assembled off robot
- Ball lift mounted onto robot
- Team logo created
- Ball feed to shooter prototyped
- Hopper built
- Bumpers started
Week Five - Build (2/5-2/11)
- Shooter Feed Chute designed & built
- Mounted
- Hopper
- Shooter
- Shooter Feed Chute
- Limit switches
- Wiring completed
- Built bumpers
- Mechanically & Electrically complete
Week Six to Finish - Test, Tweak, Fix, Lightweight & Debug (2/12-2/21)
- Testing
- Identifying & fixing bugs
- Replaced front swivel wheels with omni wheels
- DEWBOT II went on a diet
- Driver / Operator practice