DEWBOT II Build
From DEW Robotics
Revision as of 18:33, 22 August 2009 by MaiKangWei (talk | contribs) (→Week Six to Finish - Finish Build - Test & Debug (2/12-2/21))
Our build process is divided into the following five stages:
- Brainstorming & Strategic Goal Setting
- Prototyping and Tactic (Game-Play) Development
- Designing
- Building
- Testing, Debugging & Training
We prototyped the following features:
- Ball Lift
- Ball Shooter
Contents
- 1 Week One - Brainstorm, Prototype & Research (1/8-1/14)
- 2 Week Two - Complete prototyping, robot design & begin build (1/15-1/21
- 3 Week Three - Robot design, part fabrication & build (1/22-1/28)
- 4 Week Four - Transitions Continue (1/29-2/4)
- 5 Week Five - Build (2/5-2/11)
- 6 Week Six to Finish - Finish Build - Test & Debug (2/12-2/21)
Week One - Brainstorm, Prototype & Research (1/8-1/14)
- Brainstorm session on 1/8
- Inventoried the Kit of Parts
- Started prototyping & testing:
- Ball Lift
- Ball Shooter
Week Two - Complete prototyping, robot design & begin build (1/15-1/21
- Prototyped Ball Shooter
- Lift design underway in AutoCad
- Building gets underway
Week Three - Robot design, part fabrication & build (1/22-1/28)
- First Drawings out
- Electrical panel design
- Majority of part fabrication (metal cutting) done
- Assembly started on
- Electrical Panel
- Chassis
Week Four - Transitions Continue (1/29-2/4)
- All work is parallel design & build
Week Five - Build (2/5-2/11)
Week Six to Finish - Finish Build - Test & Debug (2/12-2/21)
- Start
- Testing
- Identifying & fixing bugs