Difference between revisions of "DEWBOT II Week One Build Season Photo Gallery"

From DEW Robotics
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
Image:DB2_Koenig_Mullings_060114_csm.jpg|Al Koenig & Don Mullings
 
Image:DB2_Koenig_Mullings_060114_csm.jpg|Al Koenig & Don Mullings
 
Image:DB2_John_lift_prototype_060114_csm_1.jpg|John building the ball lift prototype
 
Image:DB2_John_lift_prototype_060114_csm_1.jpg|John building the ball lift prototype
Image:DB2_Barr_060114_csm.jpg|Barr cutting wood for prototypes
+
Image:DB2_Barr_060114_csm.jpg|Charles Barr cutting wood for prototypes
 
Image:DB2_John_060114_csm.jpg|John cutting wood for lift prototype
 
Image:DB2_John_060114_csm.jpg|John cutting wood for lift prototype
 
Image:DB2_Kevin_Ian_Faller_chassis_060114_csm.jpg|Kevin, Ian & Ed Faller - early chassis work
 
Image:DB2_Kevin_Ian_Faller_chassis_060114_csm.jpg|Kevin, Ian & Ed Faller - early chassis work
Line 13: Line 13:
 
Image:DB2_John_lift_prototype_060114_csm_2.jpg|John with ball lift prototype
 
Image:DB2_John_lift_prototype_060114_csm_2.jpg|John with ball lift prototype
 
Image:DB2_Mullings_Koenig_Gelches_060114_csm.jpg|Don Mullings, Al Koenig & Will Gelches
 
Image:DB2_Mullings_Koenig_Gelches_060114_csm.jpg|Don Mullings, Al Koenig & Will Gelches
Image:DB2_Ian_Cassie_Faller_chassis_060114_csm.jpg|Ian, Ed Faller & Cassie working on chassis
+
Image:DB2_Ian_Cassie_Faller_chassis_060114_csm.jpg|Ian, Cassie & Ed Faller working on chassis
 
Image:DB2_Amber_060114_csm.jpg|Amber
 
Image:DB2_Amber_060114_csm.jpg|Amber
 
Image:DB2_Sabatino_chassis_work_060114_csm.jpg|Paul Sabatino on chassis
 
Image:DB2_Sabatino_chassis_work_060114_csm.jpg|Paul Sabatino on chassis
 
</gallery>
 
</gallery>
 
----
 
----
[[Category:Robot]][[Category:DEWBOT II]]
+
[[Category:Robot]][[Category:DEWBOT II]][[Category:Photo Galleries]]

Latest revision as of 01:14, 25 February 2010