Difference between revisions of "DEWBOT IV Build"

From DEW Robotics
Jump to: navigation, search
(Created page with 'Our build process is divided into the following five stages: *Brainstorming & Strategic Goal Setting *Prototyping and Tactic (Game-Play) Development *Designing *Building *Testing...')
 
Line 11: Line 11:
 
*Drive-train arrangements
 
*Drive-train arrangements
 
*Fast Trackball removal from Overpass
 
*Fast Trackball removal from Overpass
 +
 +
----
 +
category: [[DEWBOT IV]]

Revision as of 23:30, 1 June 2009

Our build process is divided into the following five stages:

  • Brainstorming & Strategic Goal Setting
  • Prototyping and Tactic (Game-Play) Development
  • Designing
  • Building
  • Testing & Training

We prototyped the following features:

  • Trackball capture using Forks
  • Catapult from Forks
  • Drive-train arrangements
  • Fast Trackball removal from Overpass

category: DEWBOT IV