DEWBOT IV Build
From DEW Robotics
Revision as of 23:30, 1 June 2009 by MaiKangWei (talk | contribs) (Created page with 'Our build process is divided into the following five stages: *Brainstorming & Strategic Goal Setting *Prototyping and Tactic (Game-Play) Development *Designing *Building *Testing...')
Our build process is divided into the following five stages:
- Brainstorming & Strategic Goal Setting
- Prototyping and Tactic (Game-Play) Development
- Designing
- Building
- Testing & Training
We prototyped the following features:
- Trackball capture using Forks
- Catapult from Forks
- Drive-train arrangements
- Fast Trackball removal from Overpass