DEWBOT IV Build

From DEW Robotics
Revision as of 23:30, 1 June 2009 by MaiKangWei (talk | contribs)

Jump to: navigation, search

Our build process is divided into the following five stages:

  • Brainstorming & Strategic Goal Setting
  • Prototyping and Tactic (Game-Play) Development
  • Designing
  • Building
  • Testing & Training

We prototyped the following features:

  • Trackball capture using Forks
  • Catapult from Forks
  • Drive-train arrangements
  • Fast Trackball removal from Overpass

category: DEWBOT IV