Difference between revisions of "DEWBOT IV Week Five Build Season Photo Gallery"

From DEW Robotics
Jump to: navigation, search
(Build - temporary home in the stable)
(Build - temporary home in the stable)
Line 21: Line 21:
 
Image:DB4_McKown_Rogers_080207_csm.jpg|Heather & Jack
 
Image:DB4_McKown_Rogers_080207_csm.jpg|Heather & Jack
 
Image:DB4_winch_080207_csm.jpg|Winch mounted and cable runs started
 
Image:DB4_winch_080207_csm.jpg|Winch mounted and cable runs started
Image:DB4__080207_csm.jpg
+
Image:DB4_bearing blocks_080207_csm.jpg|Drive wheel bearing blocks
 +
Image:DB4_Klufas_Maley_battery_080208_csm.jpg|Matt K & Siri install battery mount
 +
Image:DB4_Maley_McKown_Klufi_080208_csm.jpg|Siri, Matt K, Clem McKown (under robot) & Paul
 +
Image:DB4_Posner_Klufas_080208_csm.jpg|Mike & Paul
 +
Image:DB4_McKown_π÷4_jig_080208_csm.jpg|Heather with π/4 drilling jig ''(it's a math joke)''
 +
Image:DB4_pneumatics_assembly_080208_csm.jpg|pneumatics assembly
 +
Image:DB4_McKown_running_cable_080208_csm.jpg|Clem McKown running the lift cable
 +
Image:DB4_McKown_running_lift_up_080208_csm.jpg|Clem McKown (under robot) running the lift up manually (for an audience)
 +
Image:DB4_lift_up_080208_csm.jpg|Lift at full extension
 +
Image:DB4_winch_with_cable_080208_csm.jpg|Winch with (partial) cable
 +
Image:DB4__080208_csm.jpg
 
</gallery>
 
</gallery>
  

Revision as of 15:27, 28 June 2009

Build - temporary home in the stable

Build - Back to DEHS (2/10)