First drawings
Paul designing electrical panel using Inventor
The flotsam & jetsam of design
simply unexplainable
Matt assembling electronics panel
Dan with Frank Stumpo
James & Heather at the drillpress
Frank Stumpo & Clem McKown
Carly & Matt K
Mike assembles pneumatic testbed
Dan & Frank Stumpo
Siri working Shiftbox mounts
Paul Sabatino turning lift spool on lathe
Mike assembling Lift frame
Electronics team
Will Gelches
Mike Coll
Brianna & Alex
tapping holes in Mid-Frame assembly
Don Mullings & Will Gelches look over drawing
Mike
Heather working on Shiftbox mounting
Electronics team - Rich Bailey, Matt W, Paul, Frank Stumpo
Alex cutting screws
Mid-Frame assembly
(Carly) cutting lightening holes in 80/20 1020 profile
Mike Coll working on Shiftboxes
Will Gelches cutting lift spool on lathe
Siri using dremel for fine work on "Arm Bridge"
Carly cutting on band saw
Will Geches instructing Dan on lathe operation
initial lift assembly
Matt W, Dan & Paul