Difference between revisions of "DEWBOT VII Competition Checklists"

From DEW Robotics
Jump to: navigation, search
(DEWBOT VII)
(new vent valve)
Line 11: Line 11:
 
#Fanger's deployment rollers & standoffs tight
 
#Fanger's deployment rollers & standoffs tight
 
#Cylinders in starting configuration
 
#Cylinders in starting configuration
 +
#Close deployment vent valve
 
#Fanger loaded & cylinder retracted
 
#Fanger loaded & cylinder retracted
 
#At pressure 120psig upstream
 
#At pressure 120psig upstream
Line 42: Line 43:
 
#Robot on (at FTA direction)
 
#Robot on (at FTA direction)
 
#Aligned correctly
 
#Aligned correctly
 +
#Check deployment vent valve is closed
 
#Fanger's battery plugged in
 
#Fanger's battery plugged in
 
#Fanger on
 
#Fanger on

Revision as of 13:24, 17 April 2011

Pit Checklist

DEWBOT VII

  1. Review with Drivers, Coach, Observers/Video
  2. Plug in DS & tether robot
  3. Bumper color
  4. Arm tension
  5. Pivot alignment, spacers, axle nuts
  6. Wheel treads & hub SHCS tight
  7. Pulley set screws & heights
  8. Claw tilt, elbow looseness, linkage & mandible nylocks
  9. Fanger's deployment rollers & standoffs tight
  10. Cylinders in starting configuration
  11. Close deployment vent valve
  12. Fanger loaded & cylinder retracted
  13. At pressure 120psig upstream
  14. Unplug tether, plug in radio & camera
  15. Switch battery (charge used one)
  16. Velcro arm
  17. Bring Fanger, DS, gloves, Velcro, HP signs (optional)

Fanger

  1. Friction drive surgical tubing
  2. Fang surgical tubing (can be pretty bad)
  3. PVC clip intact/straight/tight
  4. Wires connected to switches & motors
  5. Motor burnout
  6. Motor brackets & fang fit (on mini-Post)
  7. Battery (charge used one if switched)

If anything's wrong, use the next-rank Fanger

Drive Team Checklist

Post-Match

  1. Review with Drivers, Coach, Observers/Video
  2. Drive team recap
  3. Review next match scouting
  4. Set next match strategy with alliance
  5. Review changes with Pit Crew

Pre-Match

  1. Re-check wheels, pressure, claw in queue
  2. Remove claw bungee cord
  3. Autonomous switch set
  4. Robot on (at FTA direction)
  5. Aligned correctly
  6. Check deployment vent valve is closed
  7. Fanger's battery plugged in
  8. Fanger on
  9. Fanger's grenade pin in
  10. Ensure DS sees all joysticks and Cypress I/O