DEWBOT VII Competition Checklists

From DEW Robotics
Revision as of 22:56, 21 March 2011 by Siri (talk | contribs) (category link)

Jump to: navigation, search

Pit Checklist

DEWBOT VII

  1. Review with Drivers, Coach, Observers/Video
  2. Plug in DS & tether robot
  3. Bumper color
  4. Arm tension
  5. Pivot alignment, spacers
  6. Wheel screws & treads
  7. Pivot axles nuts & collars+spacers tight
  8. 6 SHCS in wheel hub tight
  9. Pulley set screws
  10. Fanger's deployment rollers & standoffs tight
  11. Cylinders in starting configuration
  12. Fanger loaded & cylinder retracted
  13. At pressure 120psig upstream
  14. Unplug tether, plug in radio & camera
  15. Switch battery (charge used one)
  16. Velcro arm
  17. Bring Fanger, DS, gloves, Velcro, HP signs (optional)

Fanger

  1. Check friction drive surgical tubing
  2. Check motors
  3. Check motor brackets & fang fit (on mini-Post)
  4. Check battery (charge used one if switched)
  5. Check motor power cables

Drive Team Checklist

Post-Match

  1. Review with Drivers, Coach, Observers/Video
  2. Drive team recap
  3. Review next match scouting
  4. Set next match strategy with alliance
  5. Review changes with Pit Crew

Pre-Match

  1. Re-check wheels, pressure, claw in queue
  2. Remove claw bungee cord
  3. Autonomous switch set
  4. Robot on (at FTA direction)
  5. Aligned correctly
  6. Fanger's battery plugged in
  7. Fanger on
  8. Fanger's grenade pin in
  9. Ensure DS sees all joysticks and Cypress I/O