Difference between revisions of "DEWBOT VI Field Components"
From DEW Robotics
Line 1: | Line 1: | ||
Field components is how we practice! | Field components is how we practice! | ||
+ | == Kickoff == | ||
[http://www.flickr.com/photos/botbash/sets/72157623066006513/ Pictures of the field at Kickoff]''Pictures by BotBash BOB Pitzer from 4FX Design the maker of the FRC FMS Control and Scoring Systems'' | [http://www.flickr.com/photos/botbash/sets/72157623066006513/ Pictures of the field at Kickoff]''Pictures by BotBash BOB Pitzer from 4FX Design the maker of the FRC FMS Control and Scoring Systems'' | ||
[[Media:2010-Field-Drawings.zip | 2010 Field Drawings in Solid Works CAD format]] | [[Media:2010-Field-Drawings.zip | 2010 Field Drawings in Solid Works CAD format]] | ||
+ | |||
+ | == Week 1 Progress == | ||
+ | The first week of the build season was very successful. We completed one of the bumps to practice with, and with the wheels on it moving it around the shop is a snap. The tower is also complete ready for prototype lifts. | ||
+ | |||
+ | == Week 2 Progress == | ||
+ | Sunday started off with final assembly of the goal. All of the parts were cut out during Week One. |
Revision as of 03:33, 17 January 2010
Field components is how we practice!
Kickoff
Pictures of the field at KickoffPictures by BotBash BOB Pitzer from 4FX Design the maker of the FRC FMS Control and Scoring Systems
2010 Field Drawings in Solid Works CAD format
Week 1 Progress
The first week of the build season was very successful. We completed one of the bumps to practice with, and with the wheels on it moving it around the shop is a snap. The tower is also complete ready for prototype lifts.
Week 2 Progress
Sunday started off with final assembly of the goal. All of the parts were cut out during Week One.