Difference between revisions of "DEWBOT VI Week Four Build Season Photo Gallery"
From DEW Robotics
MaiKangWei (talk | contribs) (→Wednesday February 3, 2010) |
MaiKangWei (talk | contribs) (→Wednesday February 3, 2010) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 103: | Line 103: | ||
Image:DB6_1st_drive_100203_csm.jpg|DEWBOT VI's first drive | Image:DB6_1st_drive_100203_csm.jpg|DEWBOT VI's first drive | ||
Image:DB6_over_the_hump_100203_csm.jpg|Preparing to climb over the bump (''you're going to need a bigger boat!'') - we made 4 crossings - 2 forwards & 2 backwards - all safely - & onto concrete landings | Image:DB6_over_the_hump_100203_csm.jpg|Preparing to climb over the bump (''you're going to need a bigger boat!'') - we made 4 crossings - 2 forwards & 2 backwards - all safely - & onto concrete landings | ||
− | Image:DB6_Wk4_20100203_SMW_0037.jpg| | + | Image:DB6_Wk4_20100203_SMW_0037.jpg|Jack and Paul programming. |
Image:DB6_Wk4_20100203_SMW_0038.jpg|Media Group hard at work. | Image:DB6_Wk4_20100203_SMW_0038.jpg|Media Group hard at work. | ||
Image:DB6_Wk4_20100203_SMW_0039.jpg|Dewbot VI basic wiring. | Image:DB6_Wk4_20100203_SMW_0039.jpg|Dewbot VI basic wiring. | ||
Line 110: | Line 110: | ||
Image:DB6_Wk4_MIkeRizzo20100203_SMW_0032.jpg|Mike Rizzo installing one of eight chains. | Image:DB6_Wk4_MIkeRizzo20100203_SMW_0032.jpg|Mike Rizzo installing one of eight chains. | ||
Image:DB6_Wk4_20100203_SMW_0030.jpg|The push to get the robot moving. | Image:DB6_Wk4_20100203_SMW_0030.jpg|The push to get the robot moving. | ||
− | Image:DB6_Wk4_20100203_SMW_0031.jpg| | + | Image:DB6_Wk4_20100203_SMW_0031.jpg|Ronit working on chassis. |
Image:DB6_Wk4_20100203_SMW_0022.jpg|Pivot wheel installed. | Image:DB6_Wk4_20100203_SMW_0022.jpg|Pivot wheel installed. | ||
Image:DB6_Wk4_20100203_SMW_0024.jpg|Boy, these chains are tough. | Image:DB6_Wk4_20100203_SMW_0024.jpg|Boy, these chains are tough. | ||
Image:DB6_Wk4_20100203_SMW_0025.jpg|Almost connected. Note the magnet mount on the steering drive sprocket for the angle sensor. | Image:DB6_Wk4_20100203_SMW_0025.jpg|Almost connected. Note the magnet mount on the steering drive sprocket for the angle sensor. | ||
Image:DB6_Wk4_20100203_SMW_0036.jpg|Mike Rizzo installing the last chain | Image:DB6_Wk4_20100203_SMW_0036.jpg|Mike Rizzo installing the last chain | ||
− | Image:DB6_Wk4_20100203_SMW_0026.jpg| | + | Image:DB6_Wk4_20100203_SMW_0026.jpg|Ronit and Ben strategic planning. |
Image:DB6_Wk4_20100203_SMW_0027.jpg|more planning. | Image:DB6_Wk4_20100203_SMW_0027.jpg|more planning. | ||
Image:DB6_Wk4_20100203_SMW_0029.jpg|Ben and Faith McKown | Image:DB6_Wk4_20100203_SMW_0029.jpg|Ben and Faith McKown | ||
Line 167: | Line 167: | ||
</gallery> | </gallery> | ||
---- | ---- | ||
− | [[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]] | + | [[Category:Robot]][[Category:DEWBOT VI]][[Category:DEWBOT VI Build]][[Category:Photo Galleries]] |
Latest revision as of 00:37, 4 March 2010
Contents
Sunday January 31, 2010
Monday February 1, 2010
Tuesday February 2, 2010
Wednesday February 3, 2010
Thursday February 4, 2010
Friday February 5, 2010
Saturday February 6, 2010
No pictures today, Downingtown got 16" of snow! The robot shop was closed, we will start Week 5 on Sunday.