Difference between revisions of "DEWBOT VI Week Four Build Season Photo Gallery"

From DEW Robotics
Jump to: navigation, search
(Wednesday February 3, 2010)
 
(2 intermediate revisions by 2 users not shown)
Line 103: Line 103:
 
Image:DB6_1st_drive_100203_csm.jpg|DEWBOT VI's first drive
 
Image:DB6_1st_drive_100203_csm.jpg|DEWBOT VI's first drive
 
Image:DB6_over_the_hump_100203_csm.jpg|Preparing to climb over the bump (''you're going to need a bigger boat!'') - we made 4 crossings - 2 forwards & 2 backwards - all safely - & onto concrete landings
 
Image:DB6_over_the_hump_100203_csm.jpg|Preparing to climb over the bump (''you're going to need a bigger boat!'') - we made 4 crossings - 2 forwards & 2 backwards - all safely - & onto concrete landings
Image:DB6_Wk4_20100203_SMW_0037.jpg|Michael and Paul programming.  
+
Image:DB6_Wk4_20100203_SMW_0037.jpg|Jack and Paul programming.  
 
Image:DB6_Wk4_20100203_SMW_0038.jpg|Media Group hard at work.  
 
Image:DB6_Wk4_20100203_SMW_0038.jpg|Media Group hard at work.  
 
Image:DB6_Wk4_20100203_SMW_0039.jpg|Dewbot VI basic wiring.  
 
Image:DB6_Wk4_20100203_SMW_0039.jpg|Dewbot VI basic wiring.  
Line 110: Line 110:
 
Image:DB6_Wk4_MIkeRizzo20100203_SMW_0032.jpg|Mike Rizzo installing one of eight chains.
 
Image:DB6_Wk4_MIkeRizzo20100203_SMW_0032.jpg|Mike Rizzo installing one of eight chains.
 
Image:DB6_Wk4_20100203_SMW_0030.jpg|The push to get the robot moving.  
 
Image:DB6_Wk4_20100203_SMW_0030.jpg|The push to get the robot moving.  
Image:DB6_Wk4_20100203_SMW_0031.jpg|Dinesh working on chassis.
+
Image:DB6_Wk4_20100203_SMW_0031.jpg|Ronit working on chassis.
 
Image:DB6_Wk4_20100203_SMW_0022.jpg|Pivot wheel installed.  
 
Image:DB6_Wk4_20100203_SMW_0022.jpg|Pivot wheel installed.  
 
Image:DB6_Wk4_20100203_SMW_0024.jpg|Boy, these chains are tough.  
 
Image:DB6_Wk4_20100203_SMW_0024.jpg|Boy, these chains are tough.  
 
Image:DB6_Wk4_20100203_SMW_0025.jpg|Almost connected. Note the magnet mount on the steering drive sprocket for the angle sensor.  
 
Image:DB6_Wk4_20100203_SMW_0025.jpg|Almost connected. Note the magnet mount on the steering drive sprocket for the angle sensor.  
 
Image:DB6_Wk4_20100203_SMW_0036.jpg|Mike Rizzo installing the last chain  
 
Image:DB6_Wk4_20100203_SMW_0036.jpg|Mike Rizzo installing the last chain  
Image:DB6_Wk4_20100203_SMW_0026.jpg|Dinesh and Ben strategic planning.  
+
Image:DB6_Wk4_20100203_SMW_0026.jpg|Ronit and Ben strategic planning.  
 
Image:DB6_Wk4_20100203_SMW_0027.jpg|more planning.  
 
Image:DB6_Wk4_20100203_SMW_0027.jpg|more planning.  
 
Image:DB6_Wk4_20100203_SMW_0029.jpg|Ben and Faith McKown  
 
Image:DB6_Wk4_20100203_SMW_0029.jpg|Ben and Faith McKown  

Latest revision as of 00:37, 4 March 2010

Sunday January 31, 2010

Monday February 1, 2010

Tuesday February 2, 2010

Wednesday February 3, 2010

Thursday February 4, 2010

Friday February 5, 2010

Saturday February 6, 2010

No pictures today, Downingtown got 16" of snow! The robot shop was closed, we will start Week 5 on Sunday.