Difference between revisions of "DEWBOT XVI Final Daze Build Season Photo Gallery"

From DEW Robotics
Jump to: navigation, search
(Sunday February 23, 2020)
(Sunday February 23, 2020)
Line 5: Line 5:
 
image:DB16_Build_20200223-3.jpg|
 
image:DB16_Build_20200223-3.jpg|
 
image:DB16_Build_20200223-4.jpg|
 
image:DB16_Build_20200223-4.jpg|
image:DB16_Build_20200223-5.jpg|Bottom of Climber Extension - Bronze Leadscrew Nut (turned down) inside a 1" OD x 0.028" wall steel tube inside a printed square linear bearing, all held together with four 6-32 x 7/16" SHCSs.   
+
image:DB16_Build_20200223-5.jpg|Bottom of Climber Extension - Bronze Leadscrew Nut (turned down) inside a 1" OD x 0.028" wall steel tube inside a printed square linear bearing, all held together with four 6-32 x 7/16" SHCSs which thread into the Leadscrew Nut.  This all travels within a 1-1/2" x 1/16" wall 6061 Al square tube.   
 
image:DB16_Build_20200223-6.jpg|
 
image:DB16_Build_20200223-6.jpg|
 
image:DB16_Build_20200223-7.jpg|
 
image:DB16_Build_20200223-7.jpg|

Revision as of 01:46, 24 February 2020

Sunday February 23, 2020

Tuesday February 25, 2020

Wednesday February 26, 2020

Thursday February 27, 2020