Difference between revisions of "DEWBOT X Build"

From DEW Robotics
Jump to: navigation, search
(Week Two (1/12-1/18))
(Week Four (1/26-2/1))
Line 88: Line 88:
 
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Tuesday_January_28.2C_2014|'''Tuesday 28-January''']]
 
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Tuesday_January_28.2C_2014|'''Tuesday 28-January''']]
  
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Wednesday_January_15.2C_2014|'''Wednesday 15-January''']]
+
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Wednesday_January_29.2C_2014|'''Wednesday 29-January''']]
  
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Friday_January_17.2C_2014|'''Friday 31-January''']]
+
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Thursday_January_30.2C_2014|'''Thursday 30-January''']]
  
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Saturday_January_18.2C_2014|'''Saturday 1-February''']]
+
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Friday_January_31.2C_2014|'''Friday 31-January''']]
 +
 
 +
[[DEWBOT_X_Week_Four_Build_Season_Photo_Gallery#Saturday_February_1.2C_2014|'''Saturday 1-February''']]
  
 
;[[DEWBOT X Week Four Build Season Photo Gallery]]
 
;[[DEWBOT X Week Four Build Season Photo Gallery]]

Revision as of 04:46, 1 February 2014

The true raison d'être for FRC is found during build season, not in competition. This is where you learn. Pressure is high. Here you face your biggest challenges, and either overcome them, or are overcome by them. Build season is the lesson; competition is simply the exam.

Students join our team throughout the year, and most see competitions before build season, especially off-season events. Still, these students are rookies until they have passed through their first build season. Trial by fire.

This page contains a day by day breakdown of what we did. Dates hyper-links go to the corresponding photo gallery.

Kickoff

  • We attended kick-off at Upper Darby High School (home of old friends team 357 Royal Assault)
  • Clem McKown gave a workshop on Practical Pneumatics
  • Returning to TCHS, we went through game rules
  • then engaged in several rounds of Aerial Assist using StudentBots on a simulated field and reviewed the results
  • Made a list of functions that the robot could perform
  • Identified must-have fuctions from this list; also some don't-need functions
  • We assembled the game piece and started getting to know it
  • Decision made to re-use the 2013 pivot design without significant change (and to focus our mind-time on the game-piece handling)

Week One (1/5-1/11)

Sunday 5-January

  • Built and tested prototype air-spring kicker
  • Built and tested prototype catapult
  • Built and tested top/bottom roller frame ball pick-up
  • Started installing LabView software
  • Cleared a lot of non-essential material out of the work area

Monday 6-January

  • Tested prototype slingshot shooter
  • Started cutting Al for pivot cages (4 cut)
  • Made good progress on machinist's rack
  • Continued installing LabView
  • Vision code tested

Tuesday 7-January

  • Completed rough cutting Al for pivot cages, pivot braces and pivot module top plates
  • More work with slingshot prototype
  • Started field fabrication
  • Placed orders with: Rancocas Metals (Al plate); McMaster-Carr (Al & steel materials, tools & parts); AndyMark (Talons & wheels); Bainbots (steering motors & gearboxes); and Vexpro (sprockets)

Wednesday 8-January

  • Completed rough cutting of Pivot Tubes
  • Drilled mounting holes in Pivot Cage plates
  • Revised slingshot prototype to improve operability in testing
  • Started chassis CAD (laminar approach)
  • Machinist's rack nearing completion

Friday 10-January

Saturday 11-January

DEWBOT X Week One Build Season Photo Gallery

Week Two (1/12-1/18)

Sunday 12-January

Monday 13-January

  • Decision made to proceed with "slingshot" shooter as PLAN A
  • But a pneumatic catapult will be pursued for one week as PLAN B (Deaver lead)
  • Chassis frame provisionally designed in CAD - this is a traditional welded 6061 Al frame derived from DEWBOT VII's chassis design
  • 6061 Al stock ordered for chassis frames

Tuesday 14-January

Ball launched from slingshot - at 1/20th actual speed

Wednesday 15-January

  • Stopped work on the pneumatic catapult upon the realization that the forces needed for this device within the frame perimeter will be uncomfortably high
  • Continued development of slingshot with promising results
  • Added a release mechanism to the slingshot
  • Shot some high-speed video (240 frames/s) and 30 still shots/s photos of several slingshot launches
  • Started CAD on the bumper system - also worked on roller-frame articulation & CAD

Friday 17-January

Saturday 18-January

DEWBOT X Week Two Build Season Photo Gallery

Week Three (1/19-1/25)

Alas, the photographer was out of town on business (in Bayonne, France) throughout most of the third week. Photos of progress are therefore thin.

Saturday 25-January

DEWBOT X Week Three Build Season Photo Gallery

Week Four (1/26-2/1)

Sunday 26-January

Monday 27-January

Tuesday 28-January

Wednesday 29-January

Thursday 30-January

Friday 31-January

Saturday 1-February

DEWBOT X Week Four Build Season Photo Gallery