Tachometer sensor mount on pivot
Angle sensor mount on pivot
Kira with Deux's laser-cut e-panel
Mackenzie & Dana...
...with Gary Deaver working on re-enforcing fiberglass pultrusion
Brad, Scott Featherman & Paul
Brad & Scott Featherman
Dana & Mackenzie filling pultrusion ends with carbon fiber composite
Scott Featherman & Brad with e-panel
Yahya & Dana pulling up carbon-fiber panel
Abbi touching-up Prime's chassis paint...
...and Fatima
(4) Pivot Modules = 32.4 lbm
Chassis = 16.7 lbm
Slingshot frame & winch = 21.2 lbm
Fatima & Abbilyn
Dana and Mackenzie work with Gary Deaver on roller frame
Electronics panel for Deux
Installing electronics panel & pivots on Deux
and the roller frame
View of electronics panel
Installing the slingshot frame
Deux
Molly & Malia drill e-panel mounting holes
Kira
Winch
Lucy
Michael working on winch
Cutting pneumatic coupling on lathe
Prime's electronics panel
Kira & Keith Williams laying out the winch supports
Sullivan & Kevin T
Mackenzie, Dana and Andrew Weissman completing pivot sensor wiring
Kira mounting pancake actuator to winch
Mackenzie and Andrew Weissman
Programming team
Patrick C
Aashay & Scott Featherman
Malia cutting winch mounts
Scott Featherman & Andrew Weissman
Winch supports on mill
Jarryd drilling holes in bumper mounts
Brad mounting electrical components on Prime's e-panel
Fatima & Abbilyn holding Prime's slingshot chassis with new winch mounts
Scott Featherman & Brad start to wire Prime
Lucy designing the roller drive
Winch mounted (Deux)
Andrew Weissman with Prime's electronics panel
Bumper parts
More bumper parts
Deux's chassis showing winch and rear pivots
Deux's chassis showing electronics and front pivots