Difference between revisions of "FRC 1640 Punchlist"

From DEW Robotics
Jump to: navigation, search
(Programming / Control)
Line 1: Line 1:
==Mechanical==
+
==Mechanical Prototyping==
* Prototype roller-claw (and roller-claw-slingshot)
+
* Prototype slingshot to determine accuracy of shot positions, including by pipe (pullback) adjustment
 +
* Prototype roller frame for required rise (without or with forks)
 +
* Prototype JVN catapult to determine accuracy of shot positions and how to load
 +
 
 +
==Mechanical Fabrication==
 +
* Pivots
 +
* Field pieces
 +
* Shop organization tools
  
 
==Design==
 
==Design==
* Start chassis CAD
+
* Stack-style chassis CAD for early plywood cut (Molly)
 +
* Stack-style chassis tradeoffs (Ben, Gary, Siri, Clem, Molly, Kira)
 +
* Layout basic state logic with programmers (Siri, Julie - draft done)
 +
* System-level ball routing, ball auto-ejection, manipulator tensioning
  
 
==Programming / Control==
 
==Programming / Control==
Line 11: Line 21:
 
# Preliminary list of programming products needs to be created
 
# Preliminary list of programming products needs to be created
 
# The programming team needs to organize into product sub-teams
 
# The programming team needs to organize into product sub-teams
 +
 +
* Position and angular error spread for autonomous movement (by revolution counts) via testing procedure (Pat, Julie, Siri - procedure documented)
 +
* Demonstrate move to/wait for Hot Goal
 +
 +
==Scouting==
 +
* Layout preliminary match and pit UI sheets and Excel/Tableau files
 +
* Lock down prioritize (first generation) metrics
 +
 +
==PR==
 +
* Paint more hats
 +
* Plan/start videos (at least release video)
 +
* Vests and sweatshirts
  
 
==Welding==
 
==Welding==
 
* Complete machinist's shelf unit  
 
* Complete machinist's shelf unit  
 
 
----
 
----
 
[[Category:DEWBOT X]][[Category:DEWBOT X Build]][[Category:Organization]]
 
[[Category:DEWBOT X]][[Category:DEWBOT X Build]][[Category:Organization]]

Revision as of 19:00, 9 January 2014

Mechanical Prototyping

  • Prototype slingshot to determine accuracy of shot positions, including by pipe (pullback) adjustment
  • Prototype roller frame for required rise (without or with forks)
  • Prototype JVN catapult to determine accuracy of shot positions and how to load

Mechanical Fabrication

  • Pivots
  • Field pieces
  • Shop organization tools

Design

  • Stack-style chassis CAD for early plywood cut (Molly)
  • Stack-style chassis tradeoffs (Ben, Gary, Siri, Clem, Molly, Kira)
  • Layout basic state logic with programmers (Siri, Julie - draft done)
  • System-level ball routing, ball auto-ejection, manipulator tensioning

Programming / Control

  1. All programming team members need to install LabVIEW and FRC software on a personal computer (see DEWBOT_X_Programming for details)
  2. LabVIEW and FRC software needs to be installed on the team's computers: the driver station laptop and the IBM ThinkPad
  3. All programming team members need to complete the certification test during the meeting on Wednesday, 1/8, if they have not already completed it
  4. Preliminary list of programming products needs to be created
  5. The programming team needs to organize into product sub-teams
  • Position and angular error spread for autonomous movement (by revolution counts) via testing procedure (Pat, Julie, Siri - procedure documented)
  • Demonstrate move to/wait for Hot Goal

Scouting

  • Layout preliminary match and pit UI sheets and Excel/Tableau files
  • Lock down prioritize (first generation) metrics

PR

  • Paint more hats
  • Plan/start videos (at least release video)
  • Vests and sweatshirts

Welding

  • Complete machinist's shelf unit