==Welding==
 
==Welding==
* Complete machinist's shelf unit  
+
* Complete machinist's shelf unit.
 +
* Build a shelf storage unit for the welding area giving welding team much needed practice.
 +
* We've been using alloy 4043 for all our robot welding. However, alloy 5356 may be a better choice.  It is more ductile and stronger especially in shear, which it what many of our chassis joints are subject to.  We need to devise a simple test to evaluate.
 +
* Prepare the welding table for use, including grinding off lumps and bumps, and checking for flatness.
 +
* Make some specialty clamps suitable for chassis clamping and holding.  Drill holes in table top to accept those clamps.
 
----
 
----
 
[[Category:DEWBOT X]][[Category:DEWBOT X Build]][[Category:Organization]]
 
[[Category:DEWBOT X]][[Category:DEWBOT X Build]][[Category:Organization]]

Revision as of 21:36, 11 January 2014

Mechanical Prototyping

  • Prototype slingshot to determine accuracy of shot positions, including by pipe (pullback) adjustment
  • Prototype roller frame for required rise (without or with forks)
  • Prototype JVN catapult to determine accuracy of shot positions and how to load

Mechanical Fabrication

  • Pivots
  • Field pieces
  • Shop organization tools

Design

  • Stack-style chassis CAD for early plywood cut (Molly)
  • Stack-style chassis tradeoffs (Ben, Gary, Siri, Clem, Molly, Kira)
  • Layout basic state logic with programmers (Siri, Julie - draft done)
  • System-level ball routing, ball auto-ejection, manipulator tensioning

Programming / Control

  1. All programming team members need to install LabVIEW and FRC software on a personal computer (see DEWBOT_X_Programming for details)
  2. LabVIEW and FRC software needs to be installed on the team's computers: the driver station laptop and the IBM ThinkPad
  3. All programming team members need to complete the certification test during the meeting on Wednesday, 1/8, if they have not already completed it
  4. Preliminary list of programming products needs to be created
  5. The programming team needs to organize into product sub-teams
  • Position and angular error spread for autonomous movement (by revolution counts) via testing procedure (Pat, Julie, Siri - procedure documented)
  • Demonstrate move to/wait for Hot Goal

Scouting

  • Layout preliminary match and pit UI sheets and Excel/Tableau files
  • Lock down prioritize (first generation) metrics

PR

  • Paint more hats
  • Plan/start videos (at least release video)
  • Vests and sweatshirts

Welding

  • Complete machinist's shelf unit.
  • Build a shelf storage unit for the welding area giving welding team much needed practice.
  • We've been using alloy 4043 for all our robot welding. However, alloy 5356 may be a better choice. It is more ductile and stronger especially in shear, which it what many of our chassis joints are subject to. We need to devise a simple test to evaluate.
  • Prepare the welding table for use, including grinding off lumps and bumps, and checking for flatness.
  • Make some specialty clamps suitable for chassis clamping and holding. Drill holes in table top to accept those clamps.