Difference between revisions of "FTC 7314 Engineering Notebook 2014-10-06"
From DEW Robotics
(→Competition Season Meeting) |
MaiKangWei (talk | contribs) |
||
Line 39: | Line 39: | ||
* In the end, we made the beginning of a prototype for the drum shooter. We will still need to build a frame, add a motor, add surgical tubing/spring, and test some shooting! Sadly, we ran out of time, so we will continue this next meeting. | * In the end, we made the beginning of a prototype for the drum shooter. We will still need to build a frame, add a motor, add surgical tubing/spring, and test some shooting! Sadly, we ran out of time, so we will continue this next meeting. | ||
|} | |} | ||
+ | |||
+ | == Action and idea Journal== | ||
+ | <gallery widths=250 heights=250 perrow=3> | ||
+ | image:FTC7314_141006_csm-1.jpg| | ||
+ | image:FTC7314_141006_csm-2.jpg| | ||
+ | image:FTC7314_141006_csm-3.jpg| | ||
+ | image:FTC7314_141006_csm-4.jpg| | ||
+ | image:FTC7314_141006_csm-5.jpg| | ||
+ | image:FTC7314_141006_csm-6.jpg| | ||
+ | image:FTC7314_141006_csm-7.jpg| | ||
+ | image:FTC7314_141006_csm-8.jpg| | ||
+ | </gallery> | ||
+ | |||
+ | |||
<br /> | <br /> | ||
Revision as of 01:57, 22 October 2014
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
10/6/14 | 6pm-9pm | TCHS Brandywine | Cj Michoma, Brad Drago, Morgan Unruh, Trevor Boyce, Laura Dodds, Braydon, Nick |
Tasks | Reflections |
---|---|
Building the intake |
|
Milling 80-20 |
|
Working on the Ball Pickup |
|
Working on the Drum Shooter Prototype" |
|
Action and idea Journal
- FTC7314 141006 csm-5.jpg
- FTC7314 141006 csm-8.jpg
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|