Difference between revisions of "FTC 7314 Engineering Notebook 2015-01-14"

From DEW Robotics
Jump to: navigation, search
(Created page with '=='''Competition Season Meeting'''== <!-- This is the meeting information table --> {|border=1 cellpadding="10" !Meeting Date !!Meeting Time !!Location !!Attendees |- | Wednesda...')
 
Line 26: Line 26:
 
* After using the robot for 3 hours straight it began to give when it came to structural integrity. There was many repairs to be done such as wheels screws and flaps.
 
* After using the robot for 3 hours straight it began to give when it came to structural integrity. There was many repairs to be done such as wheels screws and flaps.
 
|} <!-- End of tasks table; DO NOT REMOVE -->
 
|} <!-- End of tasks table; DO NOT REMOVE -->
 +
 +
== Action and idea Journal==
 +
<gallery widths=250 heights=250 perrow=3>
 +
image:FTC7314_150114-1.jpg
 +
image:FTC7314_150114-2.jpg
 +
image:FTC7314_150114-3.jpg
 +
</gallery>
 +
  
 
<br />
 
<br />

Revision as of 16:53, 15 January 2015

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
Wednesday, January 14, 2015 6pm-9pm TCHS Brandywine Akhila, Josh, Trevor


Tasks Reflections
Drivers Practice
  • Trevor coached when Josh drove and Akhila operated. We tried doing fake matches and then we tried picking up balls then lining up for the center goal and scoring.
  • MWaahaahahahahahahhaahhahahahahahahahahhaha Josh thought he did quite well at trying to score in the center goal as hehaddd too posision himsself perfectely alligned.
Repair Work
  • After using the robot for 3 hours straight it began to give when it came to structural integrity. There was many repairs to be done such as wheels screws and flaps.

Action and idea Journal



Recorded by: Date: Journal Editor: Date: