Difference between revisions of "FTC 7314 Engineering Notebook 2015-09-19"

From DEW Robotics
Jump to: navigation, search
(Created page with '=='''Competition Season Meeting'''== <!-- This is the meeting information table --> {|border=1 cellpadding="10" !Meeting Date !!Meeting Time !!Location !!Attendees |- | Saturday...')
 
Line 17: Line 17:
 
!Objectives / Systems !! Hypotheses, tests, observations, conclusions, plans
 
!Objectives / Systems !! Hypotheses, tests, observations, conclusions, plans
 
|-  
 
|-  
| '''Objective in bold'''
+
| '''Climb the Mountain'''
 
|  
 
|  
* Bullet point for each hypothesis, test, observation, conclusion, plan
+
* Tops of the 1/2" Hex horizontal bars are 1.25" above the red or blue ramp (measured normal to the ramp surface).
 +
* The ramp incline is 30 deg.
 
|-
 
|-
 
| '''Objective in bold'''
 
| '''Objective in bold'''

Revision as of 17:57, 19 September 2015

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
Saturday, 19-September-2015 2:00-4:00pm TCHS Brandywine


Objectives / Systems Hypotheses, tests, observations, conclusions, plans
Climb the Mountain
  • Tops of the 1/2" Hex horizontal bars are 1.25" above the red or blue ramp (measured normal to the ramp surface).
  • The ramp incline is 30 deg.
Objective in bold
  • Bullet point for each hypothesis, test, observation, conclusion, plan


Tasks Reflections
Task in bold
  • Bullet point for each reflection
Task in bold
  • Bullet point for each reflection


Recorded by: Date: Journal Editor: Date: