* Myles finished the tank treads and helped Daniel in the Intake. | * Myles finished the tank treads and helped Daniel in the Intake. | ||
* Seth helped Clem and wade finish one of the main tank treads. | * Seth helped Clem and wade finish one of the main tank treads. | ||
− | *the team decided on a new concept for the robot, it seems similar. we all got to work with the new | + | *the team decided on a new concept for the robot, it seems similar. we all got to work with the new design. and got a lot done. |
* Trevor and Braden manufactured a servo intake beater bar, then showed others how to build it. | * Trevor and Braden manufactured a servo intake beater bar, then showed others how to build it. | ||
*Trent was putting together treads with miles and was milling with josh | *Trent was putting together treads with miles and was milling with josh | ||
Line 29: | Line 29: | ||
| | | | ||
* Josh worked with Bennett in order to mill and drill the remaining drive chain pieces. They completed cutting all of the pieces, and josh has set up the mill to drill the angled pieces. | * Josh worked with Bennett in order to mill and drill the remaining drive chain pieces. They completed cutting all of the pieces, and josh has set up the mill to drill the angled pieces. | ||
− | * Bennett worked with Josh to help drill and cut the drive chain pieces. | + | * Bennett worked with Josh to help drill and cut the drive chain pieces. He learned the basics of the mill and is "filled with joy" that he may get to use it more. |
|} <!-- End of tasks table; DO NOT REMOVE --> | |} <!-- End of tasks table; DO NOT REMOVE --> |
Revision as of 04:13, 4 December 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
19-October-2015 | 6:00-9:00 PM | TCHS Brandywine | Josh, Akhila, Braden, Bennett, Seth, Trent, Daniel, Wade, Myles, Amal, Jacob, Trevor |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Daniel,Myles, Trever and braden worked on building the Intake |
|
Milling pieces |
|
Tasks | Reflections |
---|---|
Programming | Task: Programming
They had trouble with the rotation number because the number listed online was a lot bigger than the ones they were plugging in. This resulted in the robot remaining irresponsive. The issue was really frustrating because figuring out the encoder situation is the first step to a successful autonomous. They also had problems with configuring the encoders. They will try to figure this out next time, and hopefully crack the code (pun intended). |
Task in bold |
|
Action and idea Journal
Seth & Clem McKown working on track system
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|